FYI 2022 Updated Production Schedule

Looks like they're not expecting those rail yard trucks out anytime soon. My delivery window has gotten pushed back for the 3rd time now. First it was 8/16-8/22, then 8/29-9/4, now 9/5-9/11 lol

Screenshot_20210831-080036.webp
 
mine just started showing the production date (8-30) on the Mach-E tracker, spreadsheet still shows nothing.

View attachment 32346
Pretty close to mine. Mine was built on the 29th and the Mach-E shows the same lines yours does. The dates are just slightly different. Apparently mine doesn't ship as far as yours does. I get mine on the 26th of Sept. But all the other dates are not listed.
 
When you say “extreme long range” what is that? Just curious, we have a range set up of over a mile. Most folks have a sturgeon 338 Lapua set up. Some of them head out to Raton, NM for their competitions too. I’ll have to attach some videos of 15lbs of tannerite! #boom
We have a monthly match with 4 targets ( 40x40) from 1780 out to 3090 yards. I am shooting a 375CT using 400 gr cutting edge bullets.
 
Mine was built on 8/24 and awaiting shipment but the days count down. It also says estimated 9/17. I'm wondering of mine will be like yours, not update and show up.

I just want to buy plane tickets asap and tell work I'll be off for a week.
Same here, mine shows built on 8/24. ETA of 9/12 and the days keep counting down, but, nothing else changes.
 
Good morning. Finally woke up to a built truck today!. Does anyone know if the date on the updated WS on the bottom (8/28) was the build date? It says the 30th on the tracker but I had bedliner and 5th wheel prep done as well so thinking that took a few days from the build date.
Thanks in advance.
 

Attachments

  • Screenshot_20210831-095320_Chrome.webp
    Screenshot_20210831-095320_Chrome.webp
    71.4 KB · Views: 58
  • Screenshot_20210831-095512_Photo Editor.webp
    Screenshot_20210831-095512_Photo Editor.webp
    41.8 KB · Views: 58
Good morning. Finally woke up to a built truck today!. Does anyone know if the date on the updated WS on the bottom (8/28) was the build date? It says the 30th on the tracker but I had bedliner and 5th wheel prep done as well so thinking that took a few days from the build date.
Thanks in advance.
The date I had on the sticker was 8/26, which was 12 days after the built date. The vehicle arrived at the dealer (in Houston) on 8/28. Dealer had it prepped and ready for pickup yesterday, 8/30. I had bedliner but not 5th wheel.
 
Looking at the Public SD Tracker sheet today, I see the first Non-KR with Adaptive Steering marked as In Production. So far, only King Ranch have been listed there at a stage post "In Order Processing". It is not a Tremor, but a Limited trim for a Chuck_r.

Fingers crossed that mine gets into production soon...

For directions on adding your truck to that sheet, click here
 
New here and confused. Ordered 22MY Lariat 6.7 PSD, ultimate, black package, etc. Ordered 4/6 and confirmed same day. COVP all done. Ford says build date 9/6 (moved up from 9/20). When and how do you get a window sticker and track the build (outside of Ford emails)?

Window stickers usually pop a week before the scheduled build week, so could show up sometime this week.

replace the xxxx's with your vin in link below to check and see if WS is up.

https://www.windowsticker.forddirect.com/windowsticker.pdf?vin=XXXXX


other trackers - utilize vin and order number and also provide window sticker link same as above.

https://shop.ford.com/vehicleordertracking#/

https://seg.fyi/mache-vin/#/details
 
Last edited:
I received several for F-150 and the SUV vehicles too. Don't see how others are getting PCO's for Super Duty, and don't think I've ever gotten one. For has never discounted these trucks like they do other vehicles
Same…
 
Back
Top Bottom