2024 MY Super Duty Order/Schedule/Build Thread

I think it has been mentioned, but all of the suppliers will have to get back to work as well. While I have read where the KTP workers have been told to go back, I have not seen anything about supplier status. I would *assume* that they are heading back to work as well, but I would think it is much easier to get people out of the plants than it is to ramp everything back up.
 
ClaudSS... thanks for your detailed insight. I have a Platinum that I ordered in July, three days after order banks opened. Dealer stated they have no limits on allocations. I still don't have a build date. Your comment about Platinums being only 5% of total production was good to know. Hopefully I get a build date soon.
 
I ordered a KR in Aug. No build date yet either
 
Thank you for providing this link https://www.ford.com/help/contact/ was able to confirm order submitted 5 Sep, 2023 for F250 Tremor Lariat Ultimate Black Package, winch, 6.7 HO Power Running Boards, Max Recline Seats status "In Order Processing-Unscheduled-Clean." Guess it's now waiting on production to spool up in KTP
 
Today my production date moved another week from 11/20 to 11/27. So far a two week move but i still anticipate 2-4 weeks minimum of movement with gettings things back in motion and holidays.
 
Today my production date moved another week from 11/20 to 11/27. So far a two week move but i still anticipate 2-4 weeks minimum of movement with gettings things back in motion and holidays.
Just went from 11/27 to 12/11.
 
I just went to 11/27 as well.

Ordered 9/2 - first date was 11/13, then 11/17 and now 11/27 - 250 Lariat Ult. package
 
Not a Tremor since I wanted a Supercab, but I ordered my F250 Lariat Supercab on 7/21/23.
On Sep. 07, it was scheduled to be built the week of 10/09.
On 10/08, they changed scheduled build week to 10/30. That was a few days BEFORE the Kentucky plant closed.
Haven't been able to get into Ford page for a couple weeks, but was able to get in today and it says that on 10/21 they updated my build week to 11/06.
If that was 10/21, that was 5 days BEFORE the tentative agreement was announced so don't think that is the final adjustment, but 10/30 to 11/06 would be a one week bump.

I'm not putting much weight in that date until I see the next update. It may be a couple weeks before they understand supply line and scheduling. Then I'll feel like the build week they estimate will be a bit more realistic. If there was a way, I'd prefer to slide my build week out a couple months just to let things settle and normalize (parts, assembly line work flow, emotions, etc. ). Ideally, the truck wouldn't be built and arrive at dealership until Feb because I don't need the truck until March 2024. But I guess early is better than late so will consider myself lucky.

Quoting my own post because mine just moved again today. From 11/06 to 11/13.

That makes my dates as follows:
Ordered date: 7/21
Scheduled build week:
10/09
10/30
11/06
11/13
 
My order just got bumped from 11/13 to 11/27. Exactly 2 weeks which was roughly the amount of time the strike lasted.
 
Mine started at 10/30 and went to 11/6 before the strike. The strike pushed it to 11/27. It hasn’t changed since then. I was kind of hoping it might go to 11/20 when the they started production again.
 
Interesting that some move one week vs others 2 or 3. Must be based on options and trim. Mine is lariat ult bap 7.3
 
I started at 10/30, got bumped to 11/13 during the strike. Just got bumped to 11/20 today
 
Mines still holding strong at 11/13. We shall see.
 
My order is a non-tremor lariat ultimate with the 7.3. Originally 10/9, has been bumped plenty. Today it went to 11/27.
 
Hmmm. Seems like a bunch are being planted the week of the 27th so that means just a placeholder for now.
 
I got bumped to 12/4. Was originally 10/9.
 
Still holding at 11/13… wouldn’t mind getting bumped another round of two.
 