I ordered a 2023 SRW 7.3L F350 Platinum back in November. This would fall under the Kentucky Truck Plant (KTP) which cuts over to 2024 production at the end of September per the schedule. On Thursday (8/3/23) I understand Ford scheduled the balance of the KTP 2023 model year production thru the week of September 25th. i.e. scheduled orders/issued the VINs
So any 2023 order thru the Kentucky Truck Plant not scheduled/issued a VIN, won’t be built. That would cover all F250s, F350s and F450s that aren’t solely the chassis cab. Anything I missed? Ford should be embarrassed about their performance. I'm not sure I can stomach starting over ordering a 2024.