DieselDawg88
Tremor Fanatic
My was in production 7 days before it was built.My 6.7 Lariat has been showing “in production“ since 9/17. Is 8 plus days in production typical?
Does the Kentucky plant work 7 days a week?
I did order front and rear wheel well liners. Does that mean it takes more time to have them installed at another shop/area?
Thanks