Mines on a railcar now, should be picking up next weekend. Hell it went into production about 5 days ahead of schedule and shipped the day after it showed built. I'll takt it.They are allocating those chips and things to the 6.7 builds because they have higher profit margins.
Basically any 7.3 build over an XLT is screwed.
7.3, lariat non-ult,
