I was scheduled for production the week of September 4. On August 29, the tracker changed to "In Production" but there was never a date put at the top for in production. On September 6 the date at the top appeared on the tracker for "In Production" and then it shipped on September 8. I saw on another site that when the tracker changes to "In Production", that means they are gathering pieces and putting small things together but when the date on the tracker actually changes to "In Production" is when they begin building the truck. Not sure if this is right but, that is what happened with my build.