youll need to call and change it though, if you have BAP on your order its code 17L, the new BAP without bedliner is 17MThat’s great news. I was less than a week away from dropping the BAP
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
youll need to call and change it though, if you have BAP on your order its code 17L, the new BAP without bedliner is 17MThat’s great news. I was less than a week away from dropping the BAP
Is there a price difference between the two?youll need to call and change it though, if you have BAP on your order its code 17L, the new BAP without bedliner is 17M
that IDK but since the bedliner is 500 id imagine the the 17M(without) is 500 cheaper.Is there a price difference between the two?
if you have a vin you cant change the color as far as i know. i could be wrong and im sure someone will correct meI got my VIN in January with production of 2/28 and of course that changed to 3/7. With that said, picking a color was pretty stressful and I was wondering if it is too late to change now ?
Approximately 2monthsHow long were you in production
This is “in production” not just scheduled for production?Approximately 2months
Ok that makes more senseThat was scheduled for production, but then my tracker went out for about 2 weeks and when it went back to loading the page I was built. The tracker shows in production Feb 27 & built Feb 27
Just received email truck has shipped! Now I gotta clean the shop so it fits! No problem!Just received email from Ford that truck is built and should be delivered March 16-22. Excellent!
What does final preparation mean? That’s what mine says currentlyFor you guys scouring for any detail/evidence on the Ford tracker, today my dealer informed me that my truck was at the local rail yard and my tracker went from "Delivery TBD" to "Final Preperation". It all feeds the OCD...
I think it’s just more than likely that you’re seeing the domino effect of only running 1 shift vs 3Anyone know if something on the KR is getting hold back? I order 12/16 confirmed on 12/17 got a vin on 01/13 and ever since that gotten pushed from 02/14 to 02/28 to now I’m at 03/14 i don’t have AS or spray in bed liner either for a f250 KR ultimate package 6.7 diesel
I’m pretty sure it has nothing to do with your truck being a KR. Everyone is getting pushed back. My Lariat Ultimate was originally scheduled for 3/14, then 3/28, 4/4, and now 4/11. I won’t be surprised if I get bumped again on Friday.Anyone know if something on the KR is getting hold back? I order 12/16 confirmed on 12/17 got a vin on 01/13 and ever since that gotten pushed from 02/14 to 02/28 to now I’m at 03/14 i don’t have AS or spray in bed liner either for a f250 KR ultimate package 6.7 diesel
Agreed kind of kicking myself for ordering a platinum gonna have a shit load of paint matching and blacking out that’s not gonna be cheapWell, at least Ford listened when it came to the BAP and the liner delete option on it... Now if they would only listen about adding the BAP to the Platinum trim. I'd wager they would sell way more Platinum trucks than Lariat. Just my .02
Thanks for this info. I just had my dealer change 17L to 17M for my order. Hopefully it will help.For actually did it. How hard was it…
LARIAT BLACK APPEARANCE PACKAGE WITHOUT SPRAY-IN BEDLINER (17M)
Availability:
● Optional on Lariat Crew Cab
Mine does not say built yet tho on the tracker@NextChapter and I are on the same timeline and both sent to the same ramp in WA. My tracker also updated to "final preparation" this morning.