FYI 2022 Updated Production Schedule

I woke up to this!🥳
1646137706977.webp


6.7L, Lariat Ultimate, Winch, BAP, Tremor, Power Running Boards, Moonroof, UTT Camera Pro, 5th Wheel
 
I was wondering the same thing. I ordered 2-12-2022 and now I’m thinking with the plants slowing production I may get bumped to 2023.
Hopefully that doesn’t happen. I doubt there would be much change in the trucks from 2022-2023 but I ordered a 2022 for a reason.
 
I am totally with you at this point buddy. I will be 8 months in next week and still no VIN. No one at my dealership can tell me anything. There are superdutys coming in that were ordered after mine. The dealer said he gets four regular superdutys to one Tremor. At this point I am most likely looking at a twelve month turn around from time ordered to being delivered. And I’m still not getting the truck that I originally ordered. Apparently in order to get it you have to strip half of the options because Ford is false advertising. I have found two GMC AT4 close to me that aren’t the color I want but I may just have to pull the trigger. This has become a fucking joke.
Same boat.... 8 months next week, no VIN, no help from anyone. Having a VIN would go a long way toward convincing me I'm actually going to get the truck.
 
So I am sure this has been asked and answered, but I am new to the forum and waiting game for a new truck. I ordered in January and it is confirmed. Ford asked for retail order verification and was provided. I am priority Code 10 unscheduled clean build....thoughts on time table? 350 diesel, ultimate, winch, spray bed liner, and 5th wheel prep.
 
So I am sure this has been asked and answered, but I am new to the forum and waiting game for a new truck. I ordered in January and it is confirmed. Ford asked for retail order verification and was provided. I am priority Code 10 unscheduled clean build....thoughts on time table? 350 diesel, ultimate, winch, spray bed liner, and 5th wheel prep.

Nobody can really answer that with any specificity. There are people who get trucks in under two months, people who wait nearly a year. I'm not aware of anyone who has been over a year but there are a couple I've seen that are on track to exceed a year.

There are a lot of factors on what gets you scheduled, or at least believed to be, most of which is more akin to voodoo than anything really tangible.

Just my personal observation, but it seems that when your truck is built is more a determining factor on how long you waited than when you ordered. Meaning, there isn't a consistent average over time. So if you received your truck last fall you probably waited somewhere around 5-7 months. Just a rough 'observed' (meaning, what I saw people saying on forums) average. If you got your truck today, you probably waited closer to 6-9 months.

In a couple months, I suspect that's going to look more like 7-10 months. After that, who knows. Maybe those numbers will shrink. Holidays + Omicron + Weather really threw some wrenches in the gears that may taper out and see product improve. Or, we could see ourselves having a trade war with China and have a whole new level of supply disruption.
 
Congrats!! When did you order?
Here are my dates
  • 9/8 = received order confirmation email
  • 11/18 = VIN issued with scheduled build week of 1/24
  • 12/17 = Build week moved to 1/31
  • 01/14 = Build week moved to 2/7
  • 2/4 = Build week moved to 2/14
  • 2/5 = Build week moved to 2/21
  • 2/18 = Window sticker released
  • 2/24 = Schedule Build Day via VVR
  • 2/26 = Apparently the REAL build day
  • 3/1 = Built notification
 
I just canceled and returned almost $2k of accessories from various venders on concern of many issues. When I have the truck physically in my hands I can reorder. I cannot justify having this stuff in the garage, then forced to order a 23. What a shame for everyone on this forum, but especially the world, as all this could have been prevented with a strong president. I know we are not suppose to get political, but being overseas during the Iran hostage crises, I never thought we would be back in the same crap again. Independent energy is the only solution for all this. God bless the USA
 
So....... What you are saying is my F250 6.7L KR with the chrome package NO 5th wheel, bedliner, or adaptive steer is not even going to be built until May if I don't have a VIN yet

I ordered on 11/4/21
1/16/21Removed adaptive steering, 5th wheel, and bedliner
STILL NO VIN OR BUILD DATE.

I am losing my mind over this. It means that in my blessed life of first world problems we will not be keeping the top off our Jeep for the summer because we pre traded.
 
How long was your truck showing “In Production”?
In Ford's tracker is said "In Production" from when my window sticker showed up on 2/18 until it changed to "Built" on 3/1. According to the VVR it was supposed to be built on 2/24 but the date appeared for "In Production" on 2/26 so I ASSUME that is the actual day it was built. Then it had to go across the street for bedliner, 5th wheel prep, and AMP power steps.
 
In Ford's tracker is said "In Production" from when my window sticker showed up on 2/18 until it changed to "Built" on 3/1. According to the VVR it was supposed to be built on 2/24 but the date appeared for "In Production" on 2/26 so I ASSUME that is the actual day it was built. Then it had to go across the street for bedliner, 5th wheel prep, and AMP power steps.
Mine went to “In Production” on 2/25…but according to the VVR my build date isn’t supposed to be until 3/10…hopefully it doesn’t take that long
 
So....... What you are saying is my F250 6.7L KR with the chrome package NO 5th wheel, bedliner, or adaptive steer is not even going to be built until May if I don't have a VIN yet

I ordered on 11/4/21
1/16/21Removed adaptive steering, 5th wheel, and bedliner
STILL NO VIN OR BUILD DATE.

I am losing my mind over this. It means that in my blessed life of first world problems we will not be keeping the top off our Jeep for the summer because we pre traded.

Since you didn't quote anyone I have no idea who's post you are referencing, but I'll bite anyway.

If you got scheduled today, right now, put at the end of the build queue -- I think you'd be assigned a late April build date. I was originally scheduled 03/07 a month ago. That has been pushed back, week by week, to where it currently sits, 04/11. Now, that said, I have no idea why -- the prevailing belief by most is that the third parties that install the 5th wheel prep and bed liner are the hold up.

So, in that regard -- maybe you get scheduled and actually built sometime in April since you don't have those issues. That's absolute best case scenario, from my observations. Totally just my opinion, though, who knows what Ford will do.
 