FYI 2022 Updated Production Schedule

I ordered a AMB Blacked Ultimate Lariat no AS on Tues 1/18. Black appearance package contains the spray liner, can the dealer just remove the spray liner while leaving the rest of the truck alone? I prefer Line-X anyways.
 
I ordered a AMB Blacked Ultimate Lariat no AS on Tues 1/18. Black appearance package contains the spray liner, can the dealer just remove the spray liner while leaving the rest of the truck alone? I prefer Line-X anyways.
I have the same opinion on Line-X but Ford will not allow separation of the spray in liner from the blackout package.
 
I ordered a AMB Blacked Ultimate Lariat no AS on Tues 1/18. Black appearance package contains the spray liner, can the dealer just remove the spray liner while leaving the rest of the truck alone? I prefer Line-X anyways.
No they can’t separate from the bap
 
Anybody get emails today yet about production scheduling? Not sure what time they generally go out
 
Anybody get emails today yet about production scheduling? Not sure what time they generally go out
No scheduling today, per info in POF--it was an update this morning.
 
I can’t take much more of this. Ordered 7/28, dropped 5th and bedliner last week, was looking forward to scheduling today but Ford comes through with disappointment yet again. They did send me a renewed $3k PCO over the weekend but it will expire again (4/4) before I see this thing…the first one expired 1/3/22 after receiving it in October. This is truly pathetic
I hear you brother.
 
Avoided the Tremor Forum this week, hoping that may change my luck. Really enjoy reading all the different mods, etc., but then it makes me anxious to get my truck. Oh well, my birthday is coming up 2/14, maybe an email will come before it. For all the newbies, trust me you can wait.
 
My build date was 12/23. It went I to production on 12/15. The only thing that has changed is the date on the WS. No emails or changes to the tracker.
Same here.
 
So I just glanced at my order sheet again,lol. There is a line item "job #1 order" , does that mean anything? Do the dealers add that hoping it does something, or is it there to make the customer feel warm and fuzzy? View attachment 44480
Must be a standard line item as it is on my order as well.
 
Avoided the Tremor Forum this week, hoping that may change my luck. Really enjoy reading all the different mods, etc., but then it makes me anxious to get my truck. Oh well, my birthday is coming up 2/14, maybe an email will come before it. For all the newbies, trust me you can wait.
Reading the posts and seeing how long some folks have been waiting, it's eye-opening. I ordered 9/29/21. Many folks have been waiting much longer than me. Such a strange time these days. It's unsettling to see empty lots at car dealerships in our country.
 
Figures no SD scheduling for this week, I’m already regretting removing the 5th wheel prep and AS with my luck it won’t make a bit of difference and I won’t get what I wanted now damn it
 
I ordered a AMB Blacked Ultimate Lariat no AS on Tues 1/18. Black appearance package contains the spray liner, can the dealer just remove the spray liner while leaving the rest of the truck alone? I prefer Line-X anyways.
Nope
 
Well, since Ford decided to blow up any hopes of getting scheduled this week, here's some fun with numbers regarding what options were on orders scheduled last week (from the Unscheduled Tracking spreadsheet).

Counting only orders that are either currently unscheduled or were only just scheduled last week, there are a total of 339 orders reported on the spreadsheet (we'll consider that the "Total" for this sample). There were 14 orders on the spreadsheet that were scheduled last week, so ~4% of available orders on the sheet were scheduled.

Here's the breakdown of order scheduling by engine type:
EngineTotal Orders (339)Selected for scheduling on 1/13 (14)
6.7L Diesel70% (236)79% (11)
7.3L Gas28% (96)14% (2)
6.2L Gas2% (7)7% (1)

The fairly low resolution of data here (due to such a small number of orders scheduled) spread across three mutually exclusive possibilities makes these results fairly rough, but the order percentages are close enough representation of the total order makeup that it suggests engine type does not affect scheduling success (nor has anyone suggested that it does).

Breaking down the data by options is much more useful, and interesting. Here are the options that are commonly thought of or have "officially" been reported as being limited commodities (per BOF dealer scheduling notes):

OptionTotal Orders (339)Selected for scheduling on 1/13 (14)
Adaptive Steering21% (72)43% (6)
Tremor18% (61)7% (1)
Moon Roof40% (134)50% (7)
Black Appearance Package22% (73)14% (2)
Spray-in Bed Liner58% (196)29% (4)
5th Wheel Prep67% (226)64% (9)
Retractable Tonneau5% (16)0% (0)
Hard Folding Tonneau6% (19)7% (1)
Soft Folding Tonneau3% (9)0% (0)

This (obviously very limited) data suggests that Adaptive Steering isn't a hang-up right now. The six models scheduled with AS were 3 Platinum, 2 Lariat, and 1 KR, so the KR-only scheduling of AS seems to be gone for now. Many people seems to be under the impression that the moon roof has been causing scheduling delays (in some cases, because their salesman said so), though, I don't recall ever seeing it "officially" reported as a limited commodity. This data shows that having a moon roof on your order isn't causing any scheduling problems. On the other hand, the data does show that having the Black Appearance Package or stand-alone spray-in bedliner are having a noticeable impact. The 5th wheel prep, while officially listed as a limited commodity, didn't cause any scheduling difficulty for this last round, but all three types of tonneau cover certainly did (granted, they are a small percentage of the overall population of orders, so that data doesn't offer very good resolution).

Of course, this is a bunch of voluntary data of a very small population of Ford's total order bank, so take it with a grain of salt. Still, by determining what scheduled options are over/under/equivalently represented compared to the total population of orders available to be scheduled, the results are meaningful and you can easily see what options are actually a problem at the moment.

-SR-
 
Figures no SD scheduling for this week, I’m already regretting removing the 5th wheel prep and AS with my luck it won’t make a bit of difference and I won’t get what I wanted now damn it

I was holding off on removing my 5th wheel prep until this week to see if enough people removed it that I can sneak in and grab one of the remaining ones available. Maybe I will hold off for one more week before contacting the dealer. Not sure when the cutoff for the switching to '23 model year will be. I know if I ask my dealer they will claim it is today, just so they can hurry up and get another truck produced to make money on it.
 
Well, since Ford decided to blow up any hopes of getting scheduled this week, here's some fun with numbers regarding what options were on orders scheduled last week (from the Unscheduled Tracking spreadsheet).

Counting only orders that are either currently unscheduled or were only just scheduled last week, there are a total of 339 orders reported on the spreadsheet (we'll consider that the "Total" for this sample). There were 14 orders on the spreadsheet that were scheduled last week, so ~4% of available orders on the sheet were scheduled.

Here's the breakdown of order scheduling by engine type:
EngineTotal Orders (339)Selected for scheduling on 1/13 (14)
6.7L Diesel70% (236)79% (11)
7.3L Gas28% (96)14% (2)
6.2L Gas2% (7)7% (1)

The fairly low resolution of data here (due to such a small number of orders scheduled) spread across three mutually exclusive possibilities makes these results fairly rough, but the order percentages are close enough representation of the total order makeup that it suggests engine type does not affect scheduling success (nor has anyone suggested that it does).

Breaking down the data by options is much more useful, and interesting. Here are the options that are commonly thought of or have "officially" been reported as being limited commodities (per BOF dealer scheduling notes):

OptionTotal Orders (339)Selected for scheduling on 1/13 (14)
Adaptive Steering21% (72)43% (6)
Tremor18% (61)7% (1)
Moon Roof40% (134)50% (7)
Black Appearance Package22% (73)14% (2)
Spray-in Bed Liner58% (196)29% (4)
5th Wheel Prep67% (226)64% (9)
Retractable Tonneau5% (16)0% (0)
Hard Folding Tonneau6% (19)7% (1)
Soft Folding Tonneau3% (9)0% (0)

This (obviously very limited) data suggests that Adaptive Steering isn't a hang-up right now. The six models scheduled with AS were 3 Platinum, 2 Lariat, and 1 KR, so the KR-only scheduling of AS seems to be gone for now. Many people seems to be under the impression that the moon roof has been causing scheduling delays (in some cases, because their salesman said so), though, I don't recall ever seeing it "officially" reported as a limited commodity. This data shows that having a moon roof on your order isn't causing any scheduling problems. On the other hand, the data does show that having the Black Appearance Package or stand-alone spray-in bedliner are having a noticeable impact. The 5th wheel prep, while officially listed as a limited commodity, didn't cause any scheduling difficulty for this last round, but all three types of tonneau cover certainly did (granted, they are a small percentage of the overall population of orders, so that data doesn't offer very good resolution).

Of course, this is a bunch of voluntary data of a very small population of Ford's total order bank, so take it with a grain of salt. Still, by determining what scheduled options are over/under/equivalently represented compared to the total population of orders available to be scheduled, the results are meaningful and you can easily see what options are actually a problem at the moment.

-SR-
Mine was selected for scheduling last week 1/13 and I have the Retractable Tonneau as a option, maybe I am that lucky and need to buy a lotto ticket.... or I'm gonna get the truck built to sit in a parking lot waiting for a tonneu cover :(
 
Curious, I ordered on 10/26...
12/13 my dealer said it was scheduled to be built the week of Feb 7,
the dealer gave me a VIN on January 3.


I've NEVER received an email from Ford and on Ford's "vehicle order tracking" site it only shows the day the order was confirmed and no other movement. (It also says "No window sticker released")
Should Ford be sending me updates or email? (If so - how do I get them my information?)
I've just been hitting "refresh" on their site 20 times a day to see if anything changes and having my fingers crossed for February.
 