FYI 2022 Updated Production Schedule

From what I’ve read here it’s my understanding that if my build date were pushed back, I ‘should’ receive an email from FoMoCo. Right?

The last email I got was the initial build date and vin issue, scheduled for week of 1/24.

I recently reached out to the lady that I ordered with to maintain contact, and she told me that it was scheduled for 2/14(which is the supposed build date for my wife’s expedition). I’m assuming(hoping) that she got the two vehicles mixed up since I’ve not received a push back email. Of course to support her claim, I’ve not yet received a window sticker.
 
I feel your SoCal pain. I bought from Escondido Ford for 24 years now. Their fleet manger was the best, totally hook you up going through him! My Raptor came from Maine about $7k under MSRP, my 19 F250 was about $17k under!!! Sucks, but he retired when Covid hit, and everyone else down here is shady AF or clueless I've tried to deal with. Penkse said I couldn't look at a 2022's because they weren't out in September, when 1 was sitting on their showroom floor, lol, and El Cajon didn't even know the 21-22 Super Duties were different and had a $12K markup on everything. If hadn't seen GrangerMotors post, I would be driving a GMC or Dodge right now, that's how frustrated I was, but I would at least have my truck by now...
I thought about ordering from Escondido but initial conversations didn't go well. I ended up ordering from the Temecula dealership. Order went good - but it's been silence since October! Hoping to have something before summer.
 
So I just glanced at my order sheet again,lol. There is a line item "job #1 order" , does that mean anything? Do the dealers add that hoping it does something, or is it there to make the customer feel warm and fuzzy? View attachment 44480
Quoting another forum, a thread from 10 years ago.

“Job #1 is the first vehicle of a given model year off the line. When they make a running change to production during a model year the first one of those is called Job #2. Every vehicle built to those changes are Job #2. If they do another running change it's Job #3, and so on.”
 
Well, got an update today but not what I hoped.

Ordered 8/13. F-250 7.3 Tremor Platinum, AS, 5th wheel prep, winch, spray in bedliner.
11/16 email. VIN and scheduled for week of 17 January
1/19 email. Scheduled for week of 31 January.

Still no window sticker. Hopefully, this means we are getting closer. Just ordered an RSI Smart Cap.
 
Well, got an update today but not what I hoped.

Ordered 8/13. F-250 7.3 Tremor Platinum, AS, 5th wheel prep, winch, spray in bedliner.
11/16 email. VIN and scheduled for week of 17 January
1/19 email. Scheduled for week of 31 January.

Still no window sticker. Hopefully, this means we are getting closer. Just ordered an RSI Smart Cap.

I feel like I’m invoking trouble, but as far as I know my 23rd build date is holding strong. No fifth wheel prep on my lariat ultimate blackout with AS. I ordered a few weeks before you.


Maybe fifth wheel is the bottleneck.
 
Shipped a month ago, was expecting it this week, but just got an email pushing it out a month. Ouch.

Screen Shot 2022-01-19 at 9.06.22 PM.webp
 
JCT Pals is showing my status as pending and has a freight bill # - tracker shows in production and scheduled build date last I heard was 1/26. Is it normal for them to have a freight bill # a week before they build the truck?
My JCT Pals tracker didn't update until it loaded on an actual truck. (yesterday). I've had a freight bill number since December 11th. So, I'd say YES.
 
My JCT Pals tracker didn't update until it loaded on an actual truck. (yesterday). I've had a freight bill number since December 11th. So, I'd say YES.
Mine never updated and I received an email from Ford saying the truck is at the dealership. I guess either a) it got to the dealer via some other trucking company, or b) it's not really at the dealership.
 
You know there’s going to be a point where you will need to change your screen name😀
I'm not convinced. Anyone taking bets on another Thursday passing me by?

P.S. If you've ever seen me look absolutely lost in a parking lot, you know I can probably hang on to that name for a while.
 
So this was just posted on BOF.

View attachment 44513
I can’t take much more of this. Ordered 7/28, dropped 5th and bedliner last week, was looking forward to scheduling today but Ford comes through with disappointment yet again. They did send me a renewed $3k PCO over the weekend but it will expire again (4/4) before I see this thing…the first one expired 1/3/22 after receiving it in October. This is truly pathetic
 
Only 1 week of scheduling during the last month... This is getting brutal. It's like they almost don't even want to try anymore 😂
 
I can’t take much more of this. Ordered 7/28, dropped 5th and bedliner last week, was looking forward to scheduling today but Ford comes through with disappointment yet again. They did send me a renewed $3k PCO over the weekend but it will expire again (4/4) before I see this thing…the first one expired 1/3/22 after receiving it in October. This is truly pathetic

Why dont you just get your dealer to associate the PCO with your order in VINCENT and then they are locked to your order and you are good to go... The info is all over the place how to get your dealer to do that so you dont lose it.
 
Why dont you just get your dealer to associate the PCO with your order in VINCENT and then they are locked to your order and you are good to go... The info is all over the place how to get your dealer to do that so you dont lose it.
I guess I’ll look into that. The PCO’s expiring are just a testament to how ridiculous this has gotten. It shouldn’t be this difficult to buy a truck
 
I'm sure most of you know already, but the plant has been closed since mid December and resumed operations today. So anyone that had a build date the week of December 13th your truck has been chilling out on the line. I have been in contact with someone who works at the plant, lucky bastards got MLK day off too :ROFLMAO: so for the guys who had a build date of 1/17 that just means its built during that week and not on that exact day. Apparently the plant operates 24 hours a day during the week and they also operate on weekends although not 24 hours a day. They produce about 1600 Super Duties every 24 hours. Hopefully, now that they are back up and running, they can start churning them out and we can all get our trucks sooner rather than later.
My build date was 12/23. It went I to production on 12/15. The only thing that has changed is the date on the WS. No emails or changes to the tracker.
 
My build date was 12/23. It went I to production on 12/15. The only thing that has changed is the date on the WS. No emails or changes to the tracker.
Same boat here
 
Back
Top Bottom