FYI 2022 Updated Production Schedule

At what point of the ordering process can you view the window sticker? I have a build week of 2/7 and a VIN
 
0736ABF0-9337-4573-8AB0-4FE363733379.webp
Yay, I get to join the club after all! Mid February scheduled build atm. If that holds that will make four months from order time. Lariat ultimate and sport appearance in rapid red. Relatively well outfitted, no AS, no bed spray, does have 5th wheel prep. Crossing my fingers for today for those of you with the longer wait times.
 
So excited, just got my VIN! I ordered 10/19, got my VIN today (1/13) and it says it is scheduled to be built 2/28.

Plat with adaptive steering and the 5th wheel prep. They took off the bedliner which I can get done locally in a day. Only thing I noticed that was wrong is the power deployable running boards are not on it, it's showing the off road running boards... Dang it, that will not work for my short wife...
 
So excited, just got my VIN! I ordered 10/19, got my VIN today (1/13) and it says it is scheduled to be built 2/28.

Plat with adaptive steering and the 5th wheel prep. They took off the bedliner which I can get done locally in a day. Only thing I noticed that was wrong is the power deployable running boards are not on it, it's showing the off road running boards... Dang it, that will not work for my short wife...
Time to trade in that short model year for a taller one.....
 
This ordering process is infuriating. My july 9 order is still untouched. Besides the bed liner, none of the big hold up items.

The bed liner is holding you up. I have 2 order with 2 different dealer. Yesterday I changed my order from Lariat to Platinum so I did not have the spray in bed liner hoping it would get scheduled quicker. Today I got an email for production. Yet my other Lariat order with Chapman is still untouched. Im glad I made the change to Platty yesterday! JUST IN TIME LETS GO BABY!!!
 
The bed liner is holding you up. I have 2 order with 2 different dealer. Yesterday I changed my order from Lariat to Platinum so I did not have the spray in bed liner hoping it would get scheduled quicker. Today I got an email for production. Yet my other Lariat order with Chapman is still untouched. Im glad I made the change to Platty yesterday! JUST IN TIME LETS GO BABY!!!
Mine has the bed liner as part of the black appearance package, and I got picked up today. Its possible its something else.
 
Ordered from Granger on 10/30, got the build email this morning for week of 2/28!!! It feels real all of a sudden.

Dear Brian,


We are excited to let you know your 2022 Super Duty F-250 Lariat Crew Cab has been scheduled for production. Your vehicle is scheduled to be built the week of February 28, 2022.

In your next order status email, we will provide you an estimated delivery window of when your vehicle will arrive at Granger Motors, Inc.. While you wait, check out the status of your vehicle at any time by clicking the button below.

We have included your Vehicle Identification Number (VIN) for your reference: 1FT8W2BT4XXXXXXXX.

Happy dance Thursday!!! :cool:
 
My F-350 order (5/1/21) is supposedly shipped (and due to arrive in 6 days), but the rail car it’s supposed to be on hasn’t updated since 1/6, when it was empty in Kentucky.
 
We are excited to let you know your 2022 Super Duty F-250 PlatinumCrew Cab has been scheduled for production. Your vehicle is scheduled to be built the week of February 14, 2022.

This was after I re-submitted a new order yesterday 1/12/2021 for a Platinum. Got the Confirmation yesterday as well and today I got the email for production for the 14th. Let's see how this plays out.

Should I play the lottery today?
 
Back
Top Bottom