FYI 2022 Updated Production Schedule

You are right. It’s not all black and white, commodities and other factors play a role too. And there are many on the forum who had their orders fullfilled on less than two months from both of the under invoice dealers. Just that after 3 months of my own unscheduled wait, I’m beginning to second guess my own selection.
In my opinion, which I hold in high regard, :D if you are 3 months in, the probability of your truck getting built is very high before the changeover. The unknown now is the supply chain could go from bad to worse, or it may open up and Ford runs full capacity. Allocation means very little if Ford is unable to build the vehicle.
 
Im impressed by his honesty in the process though. Reading to full post, I’ll gladly attempt to give my business to someone who is that transparent in times of conflict
Zach is proving to be a standup gentleman. He is definitely my first choice here on out.
 
In my opinion, which I hold in high regard, :D if you are 3 months in, the probability of your truck getting built is very high before the changeover. The unknown now is the supply chain could go from bad to worse, or it may open up and Ford runs full capacity. Allocation means very little if Ford is unable to build the vehicle.
Agree with you. I’m staying put for now, no point in shifting gears now.

And thanks for that info share on Granger Bronco fiasco. Hard not to agree with what others have said, Ford should reward not penalize Granger with allocations.
 
Agreed wonder how backed up Chapman is? if I would’ve known all this I probably would’ve went with a local dealer at xplan and took the extra $2500 hit
Both Tom and Zach said from the onset that the wait would be long in exchange for the heavy discount. Scheduling has no doubt gotten worse since they first opened the offer, but very few, if any, have waited longer than six months from production to delivery. Assuming Ford doesn't limit them, builds may go out to 8 months.
 
I've tried 99% IPA, vinegar, glass cleaner and thought about acetone but wasn't sure if the was a coating on the inside it might damage.
She was ready to take it back after the first few tries to get them off. They are barely noticeable now so a few more cleanings and they might be completely gone.
Have you tried using a clay bar? Gets into the small imperfections in glass.
 
I would have thought so myself, unfortunately the three dealerships I called all said their super duty allocations got cut in half. Hopefully next months allocations arent cut as well, but if sustained im worried my order won’t make it to build (211 orders on my dealers book, 34 allocations for this month) not sure how many are clean vs commodity restricted, and if the 2021 f-150 interior goes into the 23 super duty I’m not sure I’ll like the 23’. Going to be a looong wait. Lol
Since these are retail orders, I was told they don't go against their allocations rather above their allocations.
 
Both Tom and Zach said from the onset that the wait would be long in exchange for the heavy discount. Scheduling has no doubt gotten worse since they first opened the offer, but very few, if any, have waited longer than six months from production to delivery. Assuming Ford doesn't limit them, builds may go out to 8 months.
Actually 6 months will put me in March which oddly enough would work out good for me fingers crossed I guess
 
In my opinion, which I hold in high regard, :D if you are 3 months in, the probability of your truck getting built is very high before the changeover. The unknown now is the supply chain could go from bad to worse, or it may open up and Ford runs full capacity. Allocation means very little if Ford is unable to build the vehicle.
If it is standard practice, on the 2021MY Raptors, Ford gave an option to convert unscheduled 2021MY Raptors to 2022MY orders because they were converting lines. There wasn't any model years changes like what is happening with 2023MY Superduties.
 
Actually 6 months will put me in March which oddly enough would work out good for me fingers crossed I guess

Ordered ours around Thanksgiving, to beat the msrp increase. Hoping late April or sometime in May. Might be the only person on here in no hurry to get it!!
 
Since these are retail orders, I was told they don't go against their allocations rather above their allocations.
That is the consensus on BOF for COVP orders. Allocation for those orders won’t be allotted until the following month or later, as there is a lag. Allocations are also delayed during the holiday season which we just witnessed.
 
Ordered ours around Thanksgiving, to beat the msrp increase. Hoping late April or sometime in May. Might be the only person on here in no hurry to get it!!
That'll change. I don't NEED mine until end of May (daughter starts driving) but knowing it's built and 1 hour away from me waiting for transport - I'm in more of a hurry then waiting for it to be picked up for production.
 
Agree with you. I’m staying put for now, no point in shifting gears now.

And thanks for that info share on Granger Bronco fiasco. Hard not to agree with what others have said, Ford should reward not penalize Granger with allocations.
(y)
 
Both Tom and Zach said from the onset that the wait would be long in exchange for the heavy discount. Scheduling has no doubt gotten worse since they first opened the offer, but very few, if any, have waited longer than six months from production to delivery. Assuming Ford doesn't limit them, builds may go out to 8 months.
My order was at 5 months on the 6th unscheduled. I have Black package and 5th wheel so it’s obvious why. I’ll be at at least 7 months before I see my truck if I get scheduled this next round. I’m not expecting to get my golden ticket, but still hoping, like every Thursday since September.
 
I was told at the beginning of November that Chapman had 82 unscheduled around the same time Granger had 137 unscheduled. Both were saying 4-6 month wait. I could only find one local dealer that would take xplan pricing and they told me 6 months.
Chapman only being 5hrs away I went with them.
 
My order was at 5 months on the 6th unscheduled. I have Black package and 5th wheel so it’s obvious why. I’ll be at at least 7 months before I see my truck if I get scheduled this next round. I’m not expecting to get my golden ticket, but still hoping, like every Thursday since September.
With Granger or Chapman? I ask because many dealers are not managing their WBDO system to the customers advantage, in my humble opinion.

Keep in mind, the holiday delay in scheduling and plant shut down will most likely add 6-8 weeks to the already extended build time. I am expecting 6-8 months for higher trim models.
 
With Granger or Chapman? I ask because many dealers are not managing their WBDO system to the customers advantage, in my humble opinion.

Keep in mind, the holiday delay in scheduling and plant shut down will most likely add 6-8 weeks to the already extended build time. I am expecting 6-8 months for higher trim models.
Granger. I have 5th wheel prep and Black package like I said, so zero expectation. Build is a 350, 6.7, lariat ultimate, utt trailer pkg, moonroof, winch, rain sensing wipers, adaptive cruise, upfitters, garage door opener, supplemental heat, etc. NO adaptive steering.
 