-
Featured
- #4,201
Txtruckguy
Tremor Buff
- Joined
- Mar 2, 2024
- Messages
- 46
- Reaction Points
- 28
- Location
- Houston
- Current Ride
- 2020 F-250 7.3L
- Current Ride #2
- 2024 F-250 7.3l Lariat Tremor (Build week March 25)
I'm currently at 445 days since I ordered my truck. Still don't have my truck. It's been in Louisiana for a few weeks at least. But there doesn't seem to be any way to confirm when your week will come to get built.I ordered mine back in Nov '23 and haven't gotten past "Accepted by Manufacturer" without a VIN assigned. I ordered a '24 F-250 King Ranch Tremor with 6.7 HO, LED roof lights, a Tough bed, an engine block heater & Rapid-Heat supp Cab heater for when I retire and move to Alaska in about 3 years with the wife and kids. It's been 5 months and all I'm hearing from my dealer is that the order has been submitted and there's a backlog at the factory (I know the Kentucky plant has had some QC issues, maybe that's why?).