FYI 2022 Updated Production Schedule

If you placed an order before the price hike are you protected ?
Honestly it’s been hit and miss really depends on the dealer, the real problem is they have us by the balls a lot of the dealers don’t want you to take your ordered truck that way they’ll throw it on the lot for $10k over sticker
 
I know someone said it earlier but seems like most schedule this week were lariats. Anybody have a platinum scheduled? Is there something commodity wise that is a hold up on the platinum’s ?

I haven’t been ordered long but the lack of a truck is a killer. Should have kept my ‘19!!!
 
Me.....

-Ordered December 13, 2021

- Confirmation e-mail from Ford: December 14, 2021

- Scheduled build date and vin e-mail: March 17, 2022

My scheduled build date is May 9, 2022
 
I ordered mine August 31, 2021. I have a VIN but that is all. I am thinking the truck will never be built, hahaha. I guess all the options I ordered on it is the hold up.
 
It’s got to be a parts shortage in the platinum trim. Everyone that gets scheduled and built seems to be a lariat trim.

Anyone with a platinum have a schedule date? Or when was the last platinum that was scheduled?
Ordered Star White Platinum Tremor loaded completely out on 10-11-2021. Received vin and production date on 2-1-2022. Original schedule build date was the week of 3-14-2022. Since then I have been bumped 7 times to a scheduled production date the week of 5-2-2022. I completely plan on getting kicked in the nuts several more times before a solid build date happens.
 
I finally received an email from Ford that my truck shipped. Unfortunately I cannot say the process goes any better once our trucks are built as you can see by the dates below. a full 5-6 weeks once it's build with the Ford Regional Rep "red tagging" it for expediting...

1647611701146.webp


Dates
  • 9/8 = received order confirmation email
  • 11/18 = VIN issued with scheduled build week of 1/24
  • 12/17 = Build week moved to 1/31
  • 01/14 = Build week moved to 2/7
  • 2/4 = Build week moved to 2/14
  • 2/5 = Build week moved to 2/21
  • 2/18 = Window sticker released
  • 2/24 = Scheduled Build Day via VVR
  • 2/26 = Apparently the ACTUAL Build Day
  • 3/1 = Built notification with delivery March 9-15
  • 3/9 = Delivery pushed back to April 6 - 12
  • 3/15 = Text from the dealer that the Regional Rep "Red Tagged" my truck to expedite it
  • 3/18 = Shipped email with delivery April 12 - 18
 
Production must be running a little ahead of schedule. My build week was 3/21 but as of today it is in production. I saw a post about the price increases earlier. For reference, the base price now is $2295 higher than when I ordered. Thankfully I have a copy of the letter showing the price lock for orders prior to Dec. 8, thanks to this thread.
 
Sorry, forgot to add - I have been priority code 10 SINCE the beginning.
Production must be running a little ahead of schedule. My build week was 3/21 but as of today it is in production. I saw a post about the price increases earlier. For reference, the base price now is $2295 higher than when I ordered. Thankfully I have a copy of the letter showing the price lock for orders prior to Dec. 8, thanks to this thread.
You mind tagging me with that letter? Have a feeling my dealer is going to try and shaft me. Want to be prepared
 
Production must be running a little ahead of schedule. My build week was 3/21 but as of today it is in production. I saw a post about the price increases earlier. For reference, the base price now is $2295 higher than when I ordered. Thankfully I have a copy of the letter showing the price lock for orders prior to Dec. 8, thanks to this thread.
Post that letter up if you can . I think where all going to need it. :rolleyes:
 
Post that letter up if you can . I think where all going to need it. :rolleyes:
Out of curiosity for you and others, what did you agree on when placing the order? A vague number in reference to "msrp" or "invoice" or an actual number? My order has the build out sheet and then the number we agreed to written on it $XX,XXX + $799 D&H. Seems like it would be cut and dry regardless of price increases that they agreed to sell me the truck for $XX,XXX.
 
Out of curiosity for you and others, what did you agree on when placing the order? A vague number in reference to "msrp" or "invoice" or an actual number? My order has the build out sheet and then the number we agreed to written on it $XX,XXX + $799 D&H. Seems like it would be cut and dry regardless of price increases that they agreed to sell me the truck for $XX,XXX.
Msrp 68500, but I also have x-plan and first responder discount so price is about 63000
 
Msrp 68500, but I also have x-plan and first responder discount so price is about 63000
Similar. My build out sheet the msrp was 69145, invoice 65506.60. The price of purchase agreed was "$63657.60 + TAX + $799 D&H". I feel like its pretty cut and dry but maybe I'm just naïve about whenever/if the truck gets built and delivered.
 
I finally received an email from Ford that my truck shipped. Unfortunately I cannot say the process goes any better once our trucks are built as you can see by the dates below. a full 5-6 weeks once it's build with the Ford Regional Rep "red tagging" it for expediting...

View attachment 49008

Dates
  • 9/8 = received order confirmation email
  • 11/18 = VIN issued with scheduled build week of 1/24
  • 12/17 = Build week moved to 1/31
  • 01/14 = Build week moved to 2/7
  • 2/4 = Build week moved to 2/14
  • 2/5 = Build week moved to 2/21
  • 2/18 = Window sticker released
  • 2/24 = Scheduled Build Day via VVR
  • 2/26 = Apparently the ACTUAL Build Day
  • 3/1 = Built notification with delivery March 9-15
  • 3/9 = Delivery pushed back to April 6 - 12
  • 3/15 = Text from the dealer that the Regional Rep "Red Tagged" my truck to expedite it
  • 3/18 = Shipped email with delivery April 12 - 18
I've gotten zero emails from Ford..... :( I didn't even get an email from Ford when i was given the VIN. Is this something only the dealers get and the dealer just update the customer?
 
Similar. My build out sheet the msrp was 69145, invoice 65506.60. The price of purchase agreed was "$63657.60 + TAX + $799 D&H". I feel like its pretty cut and dry but maybe I'm just naïve about whenever/if the truck gets built and delivered.
I just signed and agreed on msrp but didn’t go any further or do a deposit. Only dealer in my area that would t charge ADM on my order. They said I didn’t need to do a deposit bc they would be happy to keep the truck if I changed my mind. Worked for me bc I needed to keep my options open given the market or outside chance my dads dealer got a truck. Plus they didn’t even know if I would get my truck before summer and with rates going up and economy being fragile I liked no deposit. I also missed the 12/8 cut off but it’s gone up $1k since my order bc my window sticker is exactly 1k more then my signed order. I’m just hoping for msrp on the order I sign which seems I over paid compared to what you guys got.
 
Thanks for sharing, first time I have seen this letter as well. the way I read it, please correct me if I'm wrong... The effective date of the letter is 12/8 so wouldn't it make any vehicle covered in the list price locked after that date? I ordered 2/1/22 so if I am reading this correctly I should be locked into the price agreed upon on my build sheet.
 
Back
Top Bottom