FYI 2022 Updated Production Schedule

Order placed 10/25/21…
Scheduled for Production 1/13 for build week of 2/28…
2/11 bumped to 3/7 with build to day of 3/10 2/25 tracker moved to In Production…
2/26 WS appeared…getting excited now…
 

Attachments

  • 1141192E-BD98-4D7A-A618-2B31DAE5DB59.webp
    1141192E-BD98-4D7A-A618-2B31DAE5DB59.webp
    209.3 KB · Views: 110
Why are seemingly simple parts putting constraint on builds?
BAP, spray in bed liner and fifth wheel prep?

SUPPLY CHAIN…parts are commodities and Ford can’t build trucks if they don’t have the parts. 😎
 
Last edited:
You’re getting bumped left, I’m getting bumped right! 3/14 to 3/22 to 4/4 and now 4/11 😩

I wish they’d tell us why… I’m guessing bedliner. I have the blackout package so I can’t drop it, but I’m allegedly priority 1
If you have a VIN your priority number no longer matters according to the Moderators on BOF. Hang in there Brother Ford is still building Super Duty trucks. 👍🏻
 
I haven’t even gotten a vin or build date to get bumped but seeing this roller coaster I am sure I will experience the same. Garage full of stuff already here just not truck for a while to install it on. My question is .. what is everyone’s opinions on quality with all the delays and slides? Is it going to be worse due to pressures on the workers to make up production due to all the backed up orders? Will it stay the same as QA/QC will hold to the same level?

I honestly would rather have another few weeks delay knowing I had the level of quality that one should get for a $90k truck
Exactly my thoughts.
 
I know I was complaining when I bought my wife a new car a couple years back as we ventured into the true German market. I have to say there is a HUGE difference in quality, service and personalization.

When we purchased we were introduced to our personal service advisor. Now when we go in for service we know each other by name, loaner car is always ready even when just dropping off for a regular service, car is always washed and cleaned up when we pick up very very nice process. Knock on wood have not had one bad experience from purchasing through service now at 28k miles and definitely a MB cheerleader. I will say it is blatantly obvious the difference in quality, fit and finish when I drive the lower end loaners(which are not built in the motherland) as compared to our S-class.

Shame Ford doesn’t at least bring the quality at the +$80k price point
Same good experience here. But the Audi was a garbage, sold it after 7 years sitting in the garage with 28k miles on it.
I always say go into a dealership, look around and you will note a lot of things that can predict your experience in the future if you buy that brand. (Ford unfortunately will never be the same as a MB or Audi as customer experience)
 
All truck production has been halted by president order and will switch to military vehicles
Bought some steel stocks yesterday 😁
 
Sooooooo, I placed an order for a 2022 F-350 Lariat 6.7 Stone Gray Tremor….on Friday February 5th, 2022. My salesperson said that I have an order number of D637. I have never heard of a number like that. Any significance? Thanks in advance!
D637 is just your order #. They use that and the dealer code to track your build until you receive a VIN.
 
The sanctions have stopped TSMC from exporting TO Russia, this maybe helpful to rest of the world!

I'd imagine he was making a reference to the potential for Taiwan to be having issues with China similar to what Ukraine is experiencing with Russia.
 
F350 Lariat Ultimate/Sport Appearance, fully optioned out, except AS, BL, and 5th wheel prep. I plan on a color matched LineX BL locally.

Ordered confirmed on 01/10
Confirmed VIN on 02/10……(30 days later)
Time line of scheduled build dates-
First build date - 03/28
Bumped out to 04/04
Bumped back to 03/21
Bumped back to 03/07
Bumped up to 03/14

Each day hopefully a little bit closer.
What a ride!!
Congratulations man damn i ordered mine on 1/14/22 no vin nothing f350 platinum with 8foot bed 5th wheel prep pack, sunroof, bed liner, rapid Heating, roof lighting
 
Someone who works at Kentucky plant confirmed to me that they are running just 1 shift out of 3. What does that mean? What ever they used to build in 1 week now takes 3 weeks. The volume they build in 1 month will now take 3 months to build until they are back to operating at full capacity. So all the build week bumps are a direct result of this reduction. And that is also the reason Ford is not scheduling anyone for the last few weeks and going into next. Just some basic facts.
 
Someone who works at Kentucky plant confirmed to me that they are running just 1 shift out of 3. What does that mean? What ever they used to build in 1 week now takes 3 weeks. The volume they build in 1 month will now take 3 months to build until they are back to operating at full capacity. So all the build week bumps are a direct result of this reduction. And that is also the reason Ford is not scheduling anyone for the last few weeks and going into next. Just some basic facts.
But doesn’t KTP also produce f150’s? If I remember the article I read had a direct reference to reducing or slowly production of f150’s due to chips. Who knows I would be very surprised that the f150 took different chipsets from the sd’s
 
But doesn’t KTP also produce f150’s? If I remember the article I read had a direct reference to reducing or slowly production of f150’s due to chips. Who knows I would be very surprised that the f150 took different chipsets from the sd’s
Ktp is 250/350, expedition,navigator . The f150 is at Kansas assembly , along with transit and escape . Also this week , there is no f150 production at Kansas.
 
Anyone else have a missed delivery date without an update from Ford for a new date? Originally was 2/19-2/25 for delivery. It's been sitting in the railyard since 2/6.
 