6/20/22 build week

I'm scheduled for the 6/20 production week. So far on the tracker I've got the first bubble filled in and a fraction of the second.
Window sticker showed up last Monday and just waiting impatiently for my next sign of progress.
Here are the details...
Order date: 11/22
VIN: 4/21
Prod sched: 5/23 - 5/30 - 6/13 - 6/20
WS: 6/14
Batch #: 6524
Build #: 1144/2431
Carb Gray Platinum Tremor 250 6.7
And yes, MCS delete along with a valuable gift of a $300 refund.
I ordered my Ford F-350 XLT in January
Order confirmed 01/19/2022
Order Delayed on March 18th.
With your information maybe I'll hear something toward the end of July.
No vin yet.
 
I ordered my Ford F-350 XLT in January
Order confirmed 01/19/2022
Order Delayed on March 18th.
With your information maybe I'll hear something toward the end of July.
No vin yet.
I'm getting a lot closer.
I was able to talk to my salesman and found out the CSX rail car number for my truck. Then used the 800 number to call and dictate my railcar information to an automated system to track the train across the country. It was frustrating how slow it goes, but it was cool to know day by day that it was getting closer.
This morning at 7:52am PST, the railcar was confirmed to arriving at the Dock here in SoCal. It is 70 miles away from me and will be interesting to see how long it takes to get on a semi-truck and delivered to the dealer. I can almost taste it...
 
Order Confirmed - 1/14/22
VIN - 5/12/22
Window Sticker - 6/16/22
Scheduled Build - 6/20/22
Modules Populated - 6/27/22
Built Email - 6/28/22
Projected Delivery 8 -14 July 22 (KY plant about 2.5 hrs from my house)
Shipped 8 July and arrived dealer 9 July…pick up prob mid-week after inspection, detailing, then bullet bed liner and tonneau cover install.
 
Built on 6/28, shipped the same day. Took a rail ride to Minnesota and then a quick convoy to the dealer. Delivered on 7/15.
 
Just got notification that " as of July 10th update it was at Ramp 1K at the Kentucky Truck Plant awaiting shipping with the ETA to the dealership of 8/24 - 8/30."
Can't say I'm surprised, but I am a bit disappointed.
 
Ordered 3/4, built 6/24, shipped 6/28, arrived in Dixiana,SC on 7/3… still waiting to be shipped to dealership. Estimated arrival 7/23-7/29
 
She's home and as so many others have said, worth the wait. Dealership was outstanding, no issues at all. Couldn't be happier with the experience.
 
Hello Gemini's, I just found this batch by searching and familiarizing myself more with the forum talking points.


Built 6/14
Batch 6581
Build 119/717
Delivery July 18-24

Still waiting for dealer delivery..... 😪
 
Inquiring for a buddy:
Truck was built 6/22. Shipped to CO with an ETA around 7/25 but the truck has been sitting on a rail car in Amarillo for at least 5 weeks.

Anyone build week in the 6/20s have a truck stuck on rail in Amarillo? Curious to any info on the shipping situation going on there.
 
Has anyone that were built the week of the 20 th received there trucks yet. I have been sitting in shelbyville kt at the ramp ever since
 
As of yesterday late afternoon and into the evening.

20220815_175331.jpg
20220815_205039.jpg
 
Mine showed up on August 29th and I picked it up on September 3rd. I'm glad I went for the standard bed and the Tremor package over the long bed FX4, it's interesting enough parking this in smaller lots. My old truck (a 1978 F250 Ranger Camper special) is 3 feet shorter than this one and was always fun trying to find suitable parking in certain lots.



PXL_20220904_010056307.jpg



A co-worker has a 2020 F250 XLT lifted on 37s.
PXL_20220907_223636306.jpg
 