6/20/22 build week

weatherherk

Tremor Fiend
Joined
Nov 10, 2021
Messages
294
Reaction Points
290
Location
Biloxi, Ms
Military
Air Force
Current Ride
2022 F 250 Tremor 7.3
Anyone else Scheduled to have build start the 20 of June ?
 

Truck

Tremor Fiend
Joined
Oct 12, 2021
Messages
313
Reaction Points
363
Location
nowhere
Tracker is saying scheduled maintenance 6/20, is plant closed for a holiday?
 

DRSRFR

Tremor Buff
Joined
Jan 26, 2022
Messages
75
Reaction Points
75
Location
Thousand Oaks, CA
Current Ride
2019 Ford F-150
I'm scheduled for the 6/20 production week. So far on the tracker I've got the first bubble filled in and a fraction of the second.
Window sticker showed up last Monday and just waiting impatiently for my next sign of progress.
Here are the details...
Order date: 11/22
VIN: 4/21
Prod sched: 5/23 - 5/30 - 6/13 - 6/20
WS: 6/14
Batch #: 6524
Build #: 1144/2431
Carb Gray Platinum Tremor 250 6.7
And yes, MCS delete along with a valuable gift of a $300 refund.
 

Az Rio

Tremor Member
Joined
Mar 19, 2022
Messages
15
Reaction Points
11
Location
Arizona
First Responder
Fire
6/20 build week. Ordered and confirmed 1-11-22F-350 lariat fully loaded except for 5th wheel and A/S left off due to constraints.
 
OP
OP
weatherherk

weatherherk

Tremor Fiend
Joined
Nov 10, 2021
Messages
294
Reaction Points
290
Location
Biloxi, Ms
Military
Air Force
Current Ride
2022 F 250 Tremor 7.3
I'm scheduled for the 6/20 production week. So far on the tracker I've got the first bubble filled in and a fraction of the second.
Window sticker showed up last Monday and just waiting impatiently for my next sign of progress.
Here are the details...
Order date: 11/22
VIN: 4/21
Prod sched: 5/23 - 5/30 - 6/13 - 6/20
WS: 6/14
Batch #: 6524
Build #: 1144/2431
Carb Gray Platinum Tremor 250 6.7
And yes, MCS delete along with a valuable gift of a $300 refund.
What this tracker that you speak of ?
 

Wrathchild

Tremor Buff
Joined
Jan 27, 2022
Messages
51
Reaction Points
117
Location
Kodiak, AK
Military
USCG
Current Ride
2014 Sierra
Yup! Stone gray, 6.7 lariat ultimate, 5th prep. Hopefully watch my modules populate tomorrow!
 

six1five

Tremor Member
Joined
Jan 19, 2022
Messages
15
Reaction Points
23
Location
Enzo2101!
I was scheduled for 6/20, but tracker shows in production. Dealer said delivery is expected July 4th.

Ordered: 12-22-21
Confirmed: 12-23-21
VIN Assigned: 5-12-22
Window Sticker: 6-15-22
Estimated Delivery from Dealer: 7-4-22
 

DRSRFR

Tremor Buff
Joined
Jan 26, 2022
Messages
75
Reaction Points
75
Location
Thousand Oaks, CA
Current Ride
2019 Ford F-150
Do any of you guys have batch numbers you can share? I'm interested in knowing if the batch is specific to a trim type or if it is a production lot for all trim levels and the lot is for all vehicles produced for that week.
 
OP
OP
weatherherk

weatherherk

Tremor Fiend
Joined
Nov 10, 2021
Messages
294
Reaction Points
290
Location
Biloxi, Ms
Military
Air Force
Current Ride
2022 F 250 Tremor 7.3
I was scheduled for 6/20, but tracker shows in production. Dealer said delivery is expected July 4th.

Ordered: 12-22-21
Confirmed: 12-23-21
VIN Assigned: 5-12-22
Window Sticker: 6-15-22
Estimated Delivery from Dealer: 7-4-22
Dealer got a crystal ball now huh…interesting….😊
 

Truck

Tremor Fiend
Joined
Oct 12, 2021
Messages
313
Reaction Points
363
Location
nowhere
Batch # 06556 build: 2514/3666
Stone gray, 6.7, 5th wheel, lariat value, ultimate trailer tow,
Interior: black
Accessories : wheel well liners, garage door, heated steering, floor mats
 

DRSRFR

Tremor Buff
Joined
Jan 26, 2022
Messages
75
Reaction Points
75
Location
Thousand Oaks, CA
Current Ride
2019 Ford F-150
Batch 6524.
Modules just populated this morning.
WS: 6/13
BCE Modules: 6/20

Getting closer...
 

Wrathchild

Tremor Buff
Joined
Jan 27, 2022
Messages
51
Reaction Points
117
Location
Kodiak, AK
Military
USCG
Current Ride
2014 Sierra
Batch # 06556 build: 2514/3666
Stone gray, 6.7, 5th wheel, lariat value, ultimate trailer tow,
Interior: black
Accessories : wheel well liners, garage door, heated steering, floor mats
Same batch as you. build #3033/3666. Darn near same truck (went Baja and lariat ultimate for the LEDs).
 

Tremor Saga

Founding Member
Joined
Jun 11, 2022
Messages
17
Reaction Points
7
Location
KY (CST)
Military
Army
Current Ride
‘20 Tiguan
Current Ride #2
‘22 F350, 7.3/ Lariat ULT/ SAP, Ordered 12/22, Scheduled 6/20
I was scheduled for 6/20, but tracker shows in production. Dealer said delivery is expected July 4th.

Ordered: 12-22-21
Confirmed: 12-23-21
VIN Assigned: 5-12-22
Window Sticker: 6-15-22
Estimated Delivery from Dealer: 7-4-22
Hello everyone!
This is my first post on the forum. Intend to post an introduction once I take delivery…

For now, I had to reply to this gentleman. My timeline is identical to you, except I received my WS a day earlier…
Dealer has not predicted a delivery date.

I’m about a two and a half hour drive from the factory.
See who takes delivery first… 🤔

Batch #006556, 1924/ 3666.
 

Attachments

  • 8D9A0D4C-E153-437C-86DE-C3ECC1FCD24F.jpeg
    8D9A0D4C-E153-437C-86DE-C3ECC1FCD24F.jpeg
    177.3 KB · Views: 26

Latest Discussions

Ford Tremor Supporting Member Badge
Top