weatherherk
Tremor Fiend
- Joined
- Nov 10, 2021
- Messages
- 294
- Reaction Points
- 290
- Location
- Biloxi, Ms
- Military
- Air Force
- Current Ride
- 2022 F 250 Tremor 7.3
Anyone else Scheduled to have build start the 20 of June ?
What holiday is that ?Tracker is saying scheduled maintenance 6/20, is plant closed for a holiday?
What this tracker that you speak of ?I'm scheduled for the 6/20 production week. So far on the tracker I've got the first bubble filled in and a fraction of the second.
Window sticker showed up last Monday and just waiting impatiently for my next sign of progress.
Here are the details...
Order date: 11/22
VIN: 4/21
Prod sched: 5/23 - 5/30 - 6/13 - 6/20
WS: 6/14
Batch #: 6524
Build #: 1144/2431
Carb Gray Platinum Tremor 250 6.7
And yes, MCS delete along with a valuable gift of a $300 refund.
What this tracker that you speak of ?
Found it
Dealer got a crystal ball now huh…interesting….I was scheduled for 6/20, but tracker shows in production. Dealer said delivery is expected July 4th.
Ordered: 12-22-21
Confirmed: 12-23-21
VIN Assigned: 5-12-22
Window Sticker: 6-15-22
Estimated Delivery from Dealer: 7-4-22
Same batch as you. build #3033/3666. Darn near same truck (went Baja and lariat ultimate for the LEDs).Batch # 06556 build: 2514/3666
Stone gray, 6.7, 5th wheel, lariat value, ultimate trailer tow,
Interior: black
Accessories : wheel well liners, garage door, heated steering, floor mats
Hello everyone!I was scheduled for 6/20, but tracker shows in production. Dealer said delivery is expected July 4th.
Ordered: 12-22-21
Confirmed: 12-23-21
VIN Assigned: 5-12-22
Window Sticker: 6-15-22
Estimated Delivery from Dealer: 7-4-22
Right? Bonus- he said they've been getting trucks a week before what its scheduled.Dealer got a crystal ball now huh…interesting….![]()