I should clarify - Lariat 6.7L004807 1113/3052
Ordered 12-4
3/7 first production date
Moved back to
3/21 production date
Lariat 7.3
Seems like a lot of us are in this group.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I should clarify - Lariat 6.7L004807 1113/3052
Ordered 12-4
3/7 first production date
Moved back to
3/21 production date
Lariat 7.3
Seems like a lot of us are in this group.
#4807, King Ranch, 6.7For those with batch 4871, I assume your rigs are Lariat trim. What about everyone else? Batch #4826, #4807,…
4871 1144/1276 Build week of 3/21: Mine is a F350, 6.7 Ltr, King Ranch, Tremor Package - Rapid RedFor those with batch 4871, I assume your rigs are Lariat trim. What about everyone else? Batch #4826, #4807,…
mine is 910/1276 and 4871.I am being built this week and sit at 942/1276 and same 4871 so @BUFORD and my truck will be kin. Rail to Mesquite, Tx yard. I have bought vehicles from DFW Metroplex for a number of years.
Welcome to the 4871 family, @cprice1918. You are being built right in front of mine.mine is 910/1276 and 4871.
Same here, mine came in at 3:49AM. Looks like our trucks may ride together to Chapman.004807
1597/3052
Received built email this morning.
Awesome! I was 563/3052 and no email or modules showing yet. Wonder what is going on?004807
1597/3052
Received built email this morning.
Mine populated on Monday... still no further communication. This week has been the hardest, knowing parts have been pulled.Jackpot! Modules populated in the last few minutes. Progress. Now if I could only fly to the plant to pick it up. Tracker still hasn't updated, but that seems to be expected. I could access my window sticker days before the tracker link would work. Threw my back out at work today so those heated seats can't get here quick enough. My 14' F350 XLT work truck is lacking in the "comfort" department. LOL Happy Day!
Did you have a spray in bed-liner in your order? My was build on 3/18 and still hasnt shipped to Chapman. I assume itnis because it is in queue for a bedliner.Same here, mine came in at 3:49AM. Looks like our trucks may ride together to Chapman.
004807
2133/3052
12-13-21 Order Placed
12-13-21 Order Confirmed
1-10-22 VIN Assigned
1-10-22 Scheduled for 3-21-22
2-15-22 Re-Scheduled to 3-14-22
3-3-22 Re-Scheduled to 3-21-22
3-15-22 In Production
3-16-22 Window Sticker
3-22-22 As-Built data - BCE Module code populated between 7:00PM – 11:30PM
3-23-22 Built email 03:49 AM - estimate for delivery is between April 4 and April 10
Mine got bumped again from 3/22 to 03/28. I’m hoping it really starts next week.It’s been a long 6 months! After numerous bumps, it’s time to get this sucker built. Who else is getting built this week? My dealer says I’m scheduled for Tues the 22nd. Window sticker is showing 4807, 563/3052, then convoy to CO. It will be interesting to see how the process goes from here, and how quickly other trucks built this week ship and show up to dealers.
F350 Tremor, 6.7, KR Ultimate, Star White/Stone Grey, no 5th Wheel Prep, no Bed-liner, no AS.
That’s frustrating. Hopefully next week.Mine got bumped again from 3/22 to 03/28. I’m hoping it really starts next week.
Agreed.Mine populated on Monday... still no further communication. This week has been the hardest, knowing parts have been pulled.
Jackpot! Modules populated in the last few minutes. Progress. Now if I could only fly to the plant to pick it up. Tracker still hasn't updated, but that seems to be expected. I could access my window sticker days before the tracker link would work. Threw my back out at work today so those heated seats can't get here quick enough. My 14' F350 XLT work truck is lacking in the "comfort" department. LOL Happy Day!
004807 1113/3052
Ordered 12-4
3/7 first production date
Moved back to
3/21 production date
Lariat 7.3
Seems like a lot of us are in this group. Received my build date early this morning. Delivery April 10th through the 15th. Also truck is a Tremor carbon gray sport , ultimate package
Nope, I'll do Line-X after I get it home.Did you have a spray in bed-liner in your order? My was build on 3/18 and still hasnt shipped to Chapman. I assume itnis because it is in queue for a bedliner.
Some of us with build status are 4-5 days after and are still not shipped. Hoping that shipping out isn't the next bottleneck out of Kentucky plant once build.
My truck isn't a Tremor, just a simple XLT (not sure if it makes much difference)Congratulations!
Now I can't make sense of this because you're 563/3052 and I'm 1019/3052 and I still don't have modules. People behind me (2133/3052, 1597/3052) have got built emails, and people in front of me have populated modules...
There has to be a logic to this right??