The EVER Changing Build Week Thread (Formerly 2/28)

So far so good, dodged the delay email for another week. Called Granger and my Salesman said week of 3/7 still, with a build date in the system for 3/12! Hoping we stay on track. Will be just over 4 months from order to build if that date holds.
 
Dang it . Just checked my email and got the dreaded push back. Was originally given a production week of 2/28 and I almost made it. Pushed back to 3/7 now. I can handle that if that's holds true.
 
Just checked the tracker again, no movement into production, no window sticker and no dreaded email. Still holding on to the 2/28 production week. Dealer VVR says 3/10/22 for build date. Not sure what to believe.
 
Just checked the tracker again, no movement into production, no window sticker and no dreaded email. Still holding on to the 2/28 production week. Dealer VVR says 3/10/22 for build date. Not sure what to believe.
Your build week is 3/7 then if your build date it 3/10. But these dates jump some people have a build week and then get an email a week or two ahead of it that they are build already. No consistency.
 
Your build week is 3/7 then if your build date it 3/10. But these dates jump some people have a build week and then get an email a week or two ahead of it that they are build already. No consistency.
What did you order? Trying to get an idea of what everyone else ordered to see if there is any consistency with options.
 
Got the email again tonight too.
7.3l lariat value package, spray-in bed liner, folding bed cover, fifth wheel prep, and upfitter switches.

nothing too special ordered 10/16/2021.......
original production week 2/21/2022.
bumped to week of 2/28/2022
just got the email
bumped to week of 3/7/2022
:rolleyes:
 
Who else has there #vin memorized? I have entered so many times into the vehicle tracker I have it memorized.
 
Just received the dreaded email bumped to week of 3/7. That makes the 3rd one. Just down right Bullshit!!
2/28
2/21
2/14
That coincides with the VVR from dealership
 
"We have made an adjustment to the production date for your 2022 Super Duty F-250 Lariat.

Your vehicle is now scheduled to be built the week of March 14, 2022. We will continue to keep you informed regarding your vehicle's production status."


Week of 2/28, then 3/7 and now 3/14... ugh.
 
Ordered 9/25
Vin received 1/13 for 2/21 build
Delayed 2/28
Delayed 3/7
Delayed 3/21
Delayed 3/28

If I didn’t need the damn truck I would’ve already cancelled it.
 