The EVER Changing Build Week Thread (Formerly 2/28)

I’m at week of 3/7 now with a build day of 3/10…but the only commodity issue I have on mine is BAP
looks like you and i are joined at the hip, both bap being the only commodity and both moved to 3/7. Interesting if they will build us 3/7 or keep bumping us further. Last time i got bumped on a friday night, so i’m settling in my seat now.
 
Well I got punted all the way to 3/28 and I am pretty sure its gonna get muffed in the end zone and a safety called which will cost me 2 more Build Date Delay EMAILS :ROFLMAO: I don't know if I am the only one of the original 2/28 guys who have got kicked this far back, but I feel like a one legged man in a ass kicking contest :cautious:
Im willing to bet you get back to 3/21😉 ford will realize they bumped you too much too soon, and will feel remorseful and do the right thing.
 
Sorry for the delays you guys are facing. Mine thankfully got moved up from 2/28 to 2/14 and currently shows to be "In Production". However, one of my coworkers has had their truck "In Production" since 2/1. I can't imagine the reduction in shifts helping the matter. one of these days' fellas, one of these days
The same thing happened to me. Went to "In Production" on 2/11 (was originally 2/28) and has stayed in that status. Possibly good news (maybe reading into it too much) is the date on my window sticker was updated today from 2/11 to 2/18, so it may be off the assembly line....and possibly just waiting for a chip? :(
 
The same thing happened to me. Went to "In Production" on 2/11 (was originally 2/28) and has stayed in that status. Possibly good new (maybe reading into it too much) is the date on my window sticker was updated today from 2/11 to 2/18, so it may be off the assembly line....and possibly just waiting for a chip? :(
The date on the bottom is usually the date that the truck was sent to the floor to be built
 
I ordered mine 06/23/2022 and received the email 01/13/2022 for build week 02/21/2022. Dealer told me to expect it about a month after build. So 9 months between the time I ordered it and it's delivery, I could have had a baby delivered.
baby delivered and taught it to drive the damn truck.
 
Im willing to bet you get back to 3/21😉 ford will realize they bumped you too much too soon, and will feel remorseful and do the right thing.
I'd like to be optimistic.... but if you ever see me in the grocery store line don't get behind me :LOL::LOL::LOL:
 
The date on the bottom is usually the date that the truck was sent to the floor to be built
Interesting. I was looking at a window sticker for a Tremor on a lot close by and it said 2/14 at the bottom, which is the date I believe it landed on the lot according to the salesperson.
 
Also, is anyone else having trouble logging into the Ford website to check status? I enter the order and vin number and click "Accept & Track" and it just refreshes the screen and deletes the values in the form boxes. An endless loop that never actually gets me in.
 
Interesting. I was looking at a window sticker for a Tremor on a lot close by and it said 2/14 at the bottom, which is the date I believe it landed on the lot according to the salesperson.
I’m talking about the date near special order…not the bottom
 

Attachments

  • 538E8B47-006B-4221-9508-45FBDA9BB72C.webp
    538E8B47-006B-4221-9508-45FBDA9BB72C.webp
    154.3 KB · Views: 51
Wahoo, got this just now!
Original order date 7/22, Build date notification on 1/13 for 2/28, Changed on 1/20 to 2/14, went into production on 2/8, built 2/18. Anticipated delivery date 3/1-3/7

1645280563091.webp
 
Makes sense. If that is the case, my window sticker shows 02/08/22. So it has been in production for sometime now. Wonder why it is taking so long to comple
Wahoo, got this just now!
Original order date 7/22, Build date notification on 1/13 for 2/28, Changed on 1/20 to 2/14, went into production on 2/8, built 2/18. Anticipated delivery date 3/1-3/7

View attachment 47071
:( so jealous! Congrats
 
Wahoo, got this just now!
Original order date 7/22, Build date notification on 1/13 for 2/28, Changed on 1/20 to 2/14, went into production on 2/8, built 2/18. Anticipated delivery date 3/1-3/7

View attachment 47071
Great!
 
Wahoo, got this just now!
Original order date 7/22, Build date notification on 1/13 for 2/28, Changed on 1/20 to 2/14, went into production on 2/8, built 2/18. Anticipated delivery date 3/1-3/7

View attachment 47071
Thats Awesome !!
 
Back
Top Bottom