Order Confirmed Feb 9th

Davidgandee

Tremor Newbie
Joined
Feb 22, 2022
Messages
2
Reaction Points
3
Location
North Carolina
Placed order Feb 9th 2022 and received order confirmation shortly after the same day. Was hoping somebody could give me their experience of after order confirmation until I will receive a VIN# or schedule to build date . Thank you for any information you may have .
 
This was my full timeline, ordered from Granger.

Ordered: 9/8/2021
Scheduled: 11/16/2021 (VIN received)
Built: 12/20/2021-1/22/2022 (must have been in the pipeline during the shutdown)
Shipped: 1/25/2022
Expected Delivery: 2/5-2/11
Actual Delivery to Dealer 2/4
Picked up 2/9
 
Placed order Feb 9th 2022 and received order confirmation shortly after the same day. Was hoping somebody could give me their experience of after order confirmation until I will receive a VIN# or schedule to build date . Thank you for any information you may have .
There are so many variables involved in that process you’ll find it hard to plan anything out. Build options, dealer allocations, part availability, etc.
 
I ordered a platinum to hopefully avoid the wait times of the lariat blackouts and didn’t add any of the ‘troublesome’ items, bed liner, bed cover, 5th wheel prep, adaptive steering, moonroof, etc
12/1/21 placed dealer order
12/3 Confirmation
12/16 VIN build est 2/7
12/28 build push est 2/14
1/19 build accelerated est 2/7
1/28 build push est 2/14
No ‘In-Production’ email though I saw it online in the tracker ~2/8
2/18 built email
2/21 shipped email

A lot of folks here are 1/2 year in with no VIN still…
 
I ordered mine 1/6
Received Confirmation 1/7
Received build date of 3/28 on 2/10
In reviewing the ford tracking status there is still noting listed. Wondered if this is normal or not. Perhaps when it gets closer to actual date or something?
 
Ordered 6/11/21
Confirmation 12/7/21 (email entered incorrectly by dealership)
1/25/22 Vin# assigned and build date of 2/14/22
2/9/22 Build date moved to 2/21/22
2/12/22 Build date moved to 2/28/22

Hopefully it will get built next week!!
 
Last edited:
This was my full timeline, ordered from Granger.

Ordered: 9/8/2021
Scheduled: 11/16/2021 (VIN received)
Built: 12/20/2021-1/22/2022 (must have been in the pipeline during the shutdown)
Shipped: 1/25/2022
Expected Delivery: 2/5-2/11
Actual Delivery to Dealer 2/4
Picked up 2/9
Thank you that is exactly the information I was asking for .
 
Back
Top