I ordered a BedRug for my soon to be built (I hope) Tremor in January. BedRug still hasn't shipped it, and is now saying it might be in the next batch on 3/17. Seems supply chains are just FUBAR all over the place.
 
Two weeks isn't bad.

In my line of work we have seen 9 month quotes for leather work boots, not custom size.

365 days to get an international HV cab and chassis, another 200 days to build it out.

24 months for a F550 cab and chassis built out with boxes, pump and tank.

16 weeks for vehicle seats.

The more complex it is the longer the wait.
 
Two weeks isn't bad.

In my line of work we have seen 9 month quotes for leather work boots, not custom size.

365 days to get an international HV cab and chassis, another 200 days to build it out.

24 months for a F550 cab and chassis built out with boxes, pump and tank.

16 weeks for vehicle seats.

The more complex it is the longer the wait.
I guess I should have posted the bedliner was ordered in mid January... specifically 1/14. So it's been almost 2 months. Their CS told me it was due to COVID work shortages and materials not being available.
 
Last edited:
I ordered some regulators and 1/8" hose for irrigation from Netafim back in June, 2021. Just showed up last week. 1,000 quantity. Some of this I'm beginning to think is intentional.
 
Call a commercial roofer and ask him how long it will take to get a flat roof on a new building.....10-12 months with no delivery or price protection, period. ISO (rigid) insulation is on allocation and roofers tell me sourcing screws and hold-down plates are as much of an issue as the insulation.
 
Definitely not just trucks. My new boat was delivered to the dealer without the wireless chargers. No word from the manufacturer or the dealer. It just showed up that way and when I questioned it the response was "oh yeah.....forgot to tell you that. They'll ship them to us and we'll install them". Strange times we live in these days......
 
Glad I didn't wait for my mid-January direct-from-BedRug-order. Cancelled it after about two weeks and found one in stock at Auto Anything (they said it was the last one). While I was on a chat with AA CSR inquiring about it, they sent me a discount code and it ended up being cheaper than from BedRug. Shop around.
 
Glad I didn't wait for my mid-January direct-from-BedRug-order. Cancelled it after about two weeks and found one in stock at Auto Anything (they said it was the last one). While I was on a chat with AA CSR inquiring about it, they sent me a discount code and it ended up being cheaper than from BedRug. Shop around.
If I had my truck, I'd do the same... but since it's probably going to be April before it gets to the dealer, I'll wait it out. IIRC I did take advantage of a promo/discount they had going at the time.
 
We had our home built in 94'. Nothing special, typical subdivision home. We've wanted a new Kitchen, Master bath, Flooring and Painting done for awhile now. We saved, shopped styles, built up our hopes .. all the standard things. I haven't been able to get a contractor to do any re-modeling for over a year. To small of a job, or I get we have a minimum cost, what your asking for doesn't sound like thats something we can do. This isn't science work, it's labor, 2x4's and sheet rock. This Covid BS has been nothing more than a excuse for shitty service.
 
We had our home built in 94'. Nothing special, typical subdivision home. We've wanted a new Kitchen, Master bath, Flooring and Painting done for awhile now. We saved, shopped styles, built up our hopes .. all the standard things. I haven't been able to get a contractor to do any re-modeling for over a year. To small of a job, or I get we have a minimum cost, what your asking for doesn't sound like thats something we can do. This isn't science work, it's labor, 2x4's and sheet rock. This Covid BS has been nothing more than a excuse for shitty service.
We had a quote done for a master bathroom remodel and the number they gave us was ~1/4 the price of our whole house! That's without any premium fixtures or tile, and an acrylic shower and tub. We would be waiting >6 months to start the job. Thanks, but no thanks. When I get my truck and can haul large materials again, I'll do it myself.

About 5 years ago, I remolded a bathroom in our old house and installed an acrylic shower unit. It was about 1/5 the price that a similar unit costs today. And if I ordered one today, I might be lucky to have it by the end of this summer.

-SR-
 
We had our home built in 94'. Nothing special, typical subdivision home. We've wanted a new Kitchen, Master bath, Flooring and Painting done for awhile now. We saved, shopped styles, built up our hopes .. all the standard things. I haven't been able to get a contractor to do any re-modeling for over a year. To small of a job, or I get we have a minimum cost, what your asking for doesn't sound like thats something we can do. This isn't science work, it's labor, 2x4's and sheet rock. This Covid BS has been nothing more than a excuse for shitty service.

Putting an addition on my house. Same thing. Hard to get contractors. Having to do a lot of the work myself.
 
We were looking at putting an inground pool in last year. We emailed 6 companies looking for quotes. TWO responded 3 months later(now May 2021) to tell us that they could come out for the estimate around June-July of 2022! That we should also put a deposit down so we can get a ground breaking date somewhere around August 2022. HAHAHAHAHA Hell NO!!
 
I’ve seen this first hand several times for some reason windows are supper hard to get and a long wait
So much multi-family work going on (apartments/condos) that nearly everything is tough to get. Chart of lumber pricing, over the last year, looks like a profile of the Rocky Mountains....up, down, up, down, up up up
 