Building a New Home For My Tremor

Pompey

Tremor Addict
Joined
Aug 19, 2020
Messages
1,619
Reaction Points
4,670
Location
Granite Belt, Queensland
Current Ride #1
2018 Subaru Outback
Current Ride #2
1999 Subaru WRX Club Spec Evo 3
I decided that if I’m going to spend over $200,000 on a truck, then I’d better take care of it by giving it a good home. I am building a single car garage for the Ranger to be attached to the house, a 22,500 litre water tank and a 9m wide, 13m long and 4m high (walls) gable shed for the truck and van. I also left enough room on the side of the shed where I would relocate the existing carport which will be for the car trailer.

So I cleared some land in the back corner of my property to house both the Tremor and the caravan it will be towing. Stage 1 consisted of cutting down some gum trees. We felled them and then started cutting them up. Next winter they will make good firewood. We left the pine tree and the other gum trees because they were angled towards the house and left them for the professionals. The kookaburras took advantage of all this tree felling and swooped down to catch every worm and insect they could.

Stage 2 was the clearing and levelling of the area which included the trees that were left. I was very lucky that we didn’t hit bed rock until almost the very end. I live in an area called the granite belt (check out the photos you’ll see lots of granite boulders) so I was worried we’d hit rock just below the surface. That would have caused real problems. Ideally it would have been better if the rock was another 50cm or so lower but it’s ok.

Stage 3 was reducing the height of the dirt walls by removing soil above them to a maximum height of about 80cm. I had to do this because council regulations require that retaining walls over a metre tall must be certified by an engineer. That requires soil testing, special aggregate for back filling and specific concrete specifications for the foundations. Stuff that!

Stage 4 is currently underway and began yesterday. This part I am doing myself. The first part is the hardest- the foundations. I’m mixing the concrete by hand in my wheelbarrow. But I think I’ll get myself an electric mixer and make life easier on myself. Anyway, I’ve done the form work and laid the first few blocks and have the ag pipes ready to install behind them. Then it will be back filling with aggregate and then soil.

8CD06053-DDB3-49E6-88A7-53542969A304.webp
48976A10-321E-427E-8F4F-AFF45A5F39C6.webp
A7324568-3BC3-429A-8064-ABEAF26FE807.webp
A0DC3524-C9D1-4370-A28F-3EEA249DEB1E.webp
0B3BB279-0AE7-4C5A-8A46-0D09A1873181.webp
124431DE-72E4-49BA-A144-8967158CD597.webp
6E2CF78D-8689-49D2-983D-79840757B6CD.webp
63A581EF-F866-4361-A82A-EEF204A869E5.webp
BDCAD1A5-30D7-4123-AC17-F6D781C6E142.webp
7F11F8C3-9616-4586-89D4-AFE4B17D0417.webp
9B9A68FC-DEC4-4A08-A1E3-4DE8305BF682.webp
1FCD5370-E63C-4943-B965-D4A7504CDB0E.webp
 
Nice! Looking forward to seeing the progress. off topic, but were you on a podcast i listened to with powerstroke tech talk with arod by chance?
 
Tell us about those blocks...
They are interlocking blocks so that once you have laid the bottom row, you don’t need mortar to hold them in place. You just lay them down with each row 50% offset to the one below in the normal way. Maximum height without engineering is 1m, with engineering 1.4m.
 
They are interlocking blocks so that once you have laid the bottom row, you don’t need mortar to hold them in place. You just lay them down with each row 50% offset to the one below in the normal way. Maximum height without engineering is 1m, with engineering 1.4m.
Looks like they're designed to lay steel in and pour full of concrete.
 
Looks like they're designed to lay steel in and pour full of concrete
You have to fill them with a special aggregate which allows for both good drainage and keeping the blocks in place when over 1m high. Not applicable in my application.
 
$200,000 🤯 Is it made of gold?
 
Nice, tried to have someone build a garage addition onto the side of my existing 2.5 car here in Denver and the best quote I got was $70,000.... for 3 walls and tying in a roof!
 
I decided that if I’m going to spend over $200,000 on a truck, then I’d better take care of it by giving it a good home. I am building a single car garage for the Ranger to be attached to the house, a 22,500 litre water tank and a 9m wide, 13m long and 4m high (walls) gable shed for the truck and van. I also left enough room on the side of the shed where I would relocate the existing carport which will be for the car trailer.

So I cleared some land in the back corner of my property to house both the Tremor and the caravan it will be towing. Stage 1 consisted of cutting down some gum trees. We felled them and then started cutting them up. Next winter they will make good firewood. We left the pine tree and the other gum trees because they were angled towards the house and left them for the professionals. The kookaburras took advantage of all this tree felling and swooped down to catch every worm and insect they could.

Stage 2 was the clearing and levelling of the area which included the trees that were left. I was very lucky that we didn’t hit bed rock until almost the very end. I live in an area called the granite belt (check out the photos you’ll see lots of granite boulders) so I was worried we’d hit rock just below the surface. That would have caused real problems. Ideally it would have been better if the rock was another 50cm or so lower but it’s ok.

Stage 3 was reducing the height of the dirt walls by removing soil above them to a maximum height of about 80cm. I had to do this because council regulations require that retaining walls over a metre tall must be certified by an engineer. That requires soil testing, special aggregate for back filling and specific concrete specifications for the foundations. Stuff that!

Stage 4 is currently underway and began yesterday. This part I am doing myself. The first part is the hardest- the foundations. I’m mixing the concrete by hand in my wheelbarrow. But I think I’ll get myself an electric mixer and make life easier on myself. Anyway, I’ve done the form work and laid the first few blocks and have the ag pipes ready to install behind them. Then it will be back filling with aggregate and then soil.

View attachment 32860View attachment 32861View attachment 32862View attachment 32863View attachment 32864View attachment 32865View attachment 32866View attachment 32867View attachment 32868View attachment 32869View attachment 32870View attachment 32871
Those look like part of the tooling to make production cylinder blocks in high volume. Even looks like there are inserts for the main bearing journals. Very interesting, looks like a cool project by a man who loves his vehicles!!
 
Like you even need a building permit out there? The bureaucrats
have you by the short hairs! Crack on, though. 😉
It’s ridiculous. With the current zoning, I am not allowed to build within 10 metres of the boundary. If I lived in town, it would be 1.5 metres. Yet I can’t even see my neighbours house. It’s just bush and granite boulders. So I have to spend an outrageous $1,600.01 to get my land rezoned. Only a government would add the extra cent. If I lived in town, rezoning would only cost a few hundred.
 
No, but it is transported half round the world, partly dismantled, re-manufactured to RHD and none of that comes cheaply, unfortunately.
Who does the change over to rhd? Any pics of that?
 
I decided that if I’m going to spend over $200,000 on a truck, then I’d better take care of it by giving it a good home. I am building a single car garage for the Ranger to be attached to the house, a 22,500 litre water tank and a 9m wide, 13m long and 4m high (walls) gable shed for the truck and van. I also left enough room on the side of the shed where I would relocate the existing carport which will be for the car trailer.

So I cleared some land in the back corner of my property to house both the Tremor and the caravan it will be towing. Stage 1 consisted of cutting down some gum trees. We felled them and then started cutting them up. Next winter they will make good firewood. We left the pine tree and the other gum trees because they were angled towards the house and left them for the professionals. The kookaburras took advantage of all this tree felling and swooped down to catch every worm and insect they could.

Stage 2 was the clearing and levelling of the area which included the trees that were left. I was very lucky that we didn’t hit bed rock until almost the very end. I live in an area called the granite belt (check out the photos you’ll see lots of granite boulders) so I was worried we’d hit rock just below the surface. That would have caused real problems. Ideally it would have been better if the rock was another 50cm or so lower but it’s ok.

Stage 3 was reducing the height of the dirt walls by removing soil above them to a maximum height of about 80cm. I had to do this because council regulations require that retaining walls over a metre tall must be certified by an engineer. That requires soil testing, special aggregate for back filling and specific concrete specifications for the foundations. Stuff that!

Stage 4 is currently underway and began yesterday. This part I am doing myself. The first part is the hardest- the foundations. I’m mixing the concrete by hand in my wheelbarrow. But I think I’ll get myself an electric mixer and make life easier on myself. Anyway, I’ve done the form work and laid the first few blocks and have the ag pipes ready to install behind them. Then it will be back filling with aggregate and then soil.

View attachment 32860View attachment 32861View attachment 32862View attachment 32863View attachment 32864View attachment 32865View attachment 32866View attachment 32867View attachment 32868View attachment 32869View attachment 32870View attachment 32871
Wow, I love this. It's great to see and read about how construction methods are similar and also different compared to here in the States. It's also great to see you are doing much of the work yourself. I built my truck shed a couple years ago and tried to accomplish many of the goals you are currently tackling. I too did about 90% of the work myself, hiring out the concrete slab and the brick facade on the front exterior. Pretty good way to spend your time productively while waiting on delivery. Can't wait to see the end results. Here's some pics of my shed:
1630798223480.png
1630798241028.png
 
Last edited:
Wow, I love this. It's great to see and read about how construction methods are similar and also different compared to here in the States. It's also great to see you are doing much of the work yourself. I built my truck shed a couple years ago and tried to accomplish many of the goals you are currently tackling. I too did about 90% of the work myself, hiring out the concrete slab and the brick facade on the front exterior. Pretty good way to spend your time productively while waiting on delivery. Can't wait to see the end results. Here's some pics of my shed both construction and complete:
View attachment 32879View attachment 32883View attachment 32882View attachment 32884View attachment 32887View attachment 32885View attachment 32886View attachment 32888View attachment 32889View attachment 32890View attachment 32891View attachment 32892View attachment 32893View attachment 32894
Alas, I can only do the retaining wall myself. My shed will be all metal construction So it’s well beyond what I can do. You’re obviously a lot more skilled than me in this area. I am interested in your comment about the similarities and differences in const methods. In what ways?
 
Alas, I can only do the retaining wall myself. My shed will be all metal construction So it’s well beyond what I can do. You’re obviously a lot more skilled than me in this area. I am interested in your comment about the similarities and differences in const methods. In what ways?
Based on your comments on regulatory requirements, ground conditions and the style of foundation blocks, it just sounds like there may be interesting differences. I like steel construction so that will also be interesting to see. Because I built most of mine alone I had to get creative with handling large assemblies and coming up with methods that worked for me. This was my first solo contruction project of this size. Keep us posted with the progress. 🍻
 