I decided that if I’m going to spend over $200,000 on a truck, then I’d better take care of it by giving it a good home. I am building a single car garage for the Ranger to be attached to the house, a 22,500 litre water tank and a 9m wide, 13m long and 4m high (walls) gable shed for the truck and van. I also left enough room on the side of the shed where I would relocate the existing carport which will be for the car trailer.
So I cleared some land in the back corner of my property to house both the Tremor and the caravan it will be towing. Stage 1 consisted of cutting down some gum trees. We felled them and then started cutting them up. Next winter they will make good firewood. We left the pine tree and the other gum trees because they were angled towards the house and left them for the professionals. The kookaburras took advantage of all this tree felling and swooped down to catch every worm and insect they could.
Stage 2 was the clearing and levelling of the area which included the trees that were left. I was very lucky that we didn’t hit bed rock until almost the very end. I live in an area called the granite belt (check out the photos you’ll see lots of granite boulders) so I was worried we’d hit rock just below the surface. That would have caused real problems. Ideally it would have been better if the rock was another 50cm or so lower but it’s ok.
Stage 3 was reducing the height of the dirt walls by removing soil above them to a maximum height of about 80cm. I had to do this because council regulations require that retaining walls over a metre tall must be certified by an engineer. That requires soil testing, special aggregate for back filling and specific concrete specifications for the foundations. Stuff that!
Stage 4 is currently underway and began yesterday. This part I am doing myself. The first part is the hardest- the foundations. I’m mixing the concrete by hand in my wheelbarrow. But I think I’ll get myself an electric mixer and make life easier on myself. Anyway, I’ve done the form work and laid the first few blocks and have the ag pipes ready to install behind them. Then it will be back filling with aggregate and then soil.
So I cleared some land in the back corner of my property to house both the Tremor and the caravan it will be towing. Stage 1 consisted of cutting down some gum trees. We felled them and then started cutting them up. Next winter they will make good firewood. We left the pine tree and the other gum trees because they were angled towards the house and left them for the professionals. The kookaburras took advantage of all this tree felling and swooped down to catch every worm and insect they could.
Stage 2 was the clearing and levelling of the area which included the trees that were left. I was very lucky that we didn’t hit bed rock until almost the very end. I live in an area called the granite belt (check out the photos you’ll see lots of granite boulders) so I was worried we’d hit rock just below the surface. That would have caused real problems. Ideally it would have been better if the rock was another 50cm or so lower but it’s ok.
Stage 3 was reducing the height of the dirt walls by removing soil above them to a maximum height of about 80cm. I had to do this because council regulations require that retaining walls over a metre tall must be certified by an engineer. That requires soil testing, special aggregate for back filling and specific concrete specifications for the foundations. Stuff that!
Stage 4 is currently underway and began yesterday. This part I am doing myself. The first part is the hardest- the foundations. I’m mixing the concrete by hand in my wheelbarrow. But I think I’ll get myself an electric mixer and make life easier on myself. Anyway, I’ve done the form work and laid the first few blocks and have the ag pipes ready to install behind them. Then it will be back filling with aggregate and then soil.