4/4 Build week thread.

Scheduled delivery is between 4/17-4/23
i’ll go down and take to the dealer to negotiate if they can hold it until after i close. 🤞🏼🤞🏼🤞🏼🤞🏼
 

Attachments

  • 38EECCC5-CD39-4568-B616-DCE4863C9EB8.webp
    38EECCC5-CD39-4568-B616-DCE4863C9EB8.webp
    47.4 KB · Views: 46
WS just changed to 4/8/22😃
 
Interesting since we are in the same batch and I’m still showing 4/7. Maybe we are running on the night shift and yours gets built in the early am? I’m before you at 134.

In other news, my codes just populated too :).
I was thinking exactly the same. The batch number is very low (434), I was sure it's a night shift. Having a truck built at the last day of the week and during night? Good start! LOL
(no modules for me yet)
 
I have BCE codes, should’ve been built yesterday per the VVR but no changes to either the tracker or WS.
 
Last edited:
My date on my window sticker has changed from 4/1 to 4/8. And my truck's vin shows in stock on my dealer's website. It's just a generic pic with a lot of the wrong info but the price on the window sticker lines up as does the VIN.
 
My date on my window sticker has changed from 4/1 to 4/8. And my truck's vin shows in stock on my dealer's website. It's just a generic pic with a lot of the wrong info but the price on the window sticker lines up as does the VIN.
I am seeing the same thing at my dealer.
 
Still lingering at "In Production". Wish I knew what's going on.

-SR-
 
Received my shipped email overnight with an estimated delivery window of may 8th-14th ( to western CO).

I hope thats an over cautious estimate and it comes faster. My current 2020 tremor took 14 days total to arrive at the same dealer.
I received the same email this morning. (eastern CO)
 
I have BCE code G and still in production. Truck isn’t showing on dealers site yet.
 
Got my built email overnight, estimated to be at Granger end of April.

Clicked on the button to check the status of my truck and it still says “in production.” 🤣
 