I’m also in that batch 54/715. No updates yetI am in batch 5103. 379/715
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I’m also in that batch 54/715. No updates yetI am in batch 5103. 379/715
I just checked again and my WS is now showing today's date, so I'd say we're in business! I'm 29/715I am in batch 5103. 379/715
Your in a different batch number.I’m 134/434 and showing a 3/31 date. Seems much different from the rest of y’all.
Do you know when the clock starts for the build day?I just checked again and my WS is now showing today's date, so I'd say we're in business! I'm 29/715
Your truck que is number 202 out of 434 to be built in batch number 005145.OK, so how you all get those dates and numbers? On my WS I can see
005145
202/434
I guess 5145 is my batch number, but that's all I was able to figure out. What that means and what 202/434 is and where can I relate any date out from this?![]()
Take all of this with a grain of salt because I'm just spit balling here...OK, so how you all get those dates and numbers? On my WS I can see
005145
202/434
I guess 5145 is my batch number, but that's all I was able to figure out. What that means and what 202/434 is and where can I relate any date out from this?![]()
Just below the MSRP I see that line:Take all of this with a grain of salt because I'm just spit balling here...
Your batch number of 5145 is a group of trucks being built. Maybe the ones that will be built on a particular day. Greatoppressor and I have batch 5103 which is the group of truck being started (assembled?) today hence the change at the date on the bottom of our window stickers. Those of you with higher batch numbers probably have a later build date.
Of the 434 being built in that batch, yours is 202 of the 434.
That is the date FMC created the invoice to be sent to the dealer for payment. That date has nothing to do with build date or delivery time.Just below the MSRP I see that line:
SPECIAL ORDER NC301 N RB 2X 250 001813 03 30 22
Do you think March 30 2022 is the date I should look for? (build week of 4/4???)
Thank you
Thanks Mister Bill as well![]()
That is the date FMC created the invoice to be sent to the dealer for payment. That date has nothing to do with build date or delivery time.
The WS does not include the build date, only the batch and sequence. The 04/01/2022 date at center bottom is the last date the WS/VVR was changed or viewed. That date will change back and forth several times before the vehicle is built. Ignore it, it has no meaning to the buyer.View attachment 50294
Thank you. Now wondering still where the build date is on the WS everyone talks about?Sorry if that is something obvious.
You are with me.OK, so how you all get those dates and numbers? On my WS I can see
005145
202/434
I guess 5145 is my batch number, but that's all I was able to figure out. What that means and what 202/434 is and where can I relate any date out from this?![]()
I've never been able to figure out if one batch = one day, but it seems like there can be multiple batches in a day and maybe a batch represents a group of builds that are together because they have something in common, like maybe they are all crew cabs, or long beds, or have the same engine or who knows what else. Not really sure.Does anyone know if they will build more than one batch in a day? I'm 625/722 in batch 5170. I can't get ahold of my dealer to view the VVR so I'm curious if anybody else in batch 5170 has a confirmed build date as opposed to build week?
View attachment 50295
We are in the same batch...do you have an actual build date?Batch 5170. 165/722
Pretty logical line of thinking...I know you've got a confirmed build date of today. Any updates yet?I've never been able to figure out if one batch = one day, but it seems like there can be multiple batches in a day and maybe a batch represents a group of builds that are together because they have something in common, like maybe they are all crew cabs, or long beds, or have the same engine or who knows what else. Not really sure.
I've seen plant workers refer to weekday operations as have an A and B shift, A being the day shift and B being the night shift. I would suppose that a build date starts with A shift, but that's just a guess.
-SR-