Dates: Order, Vin#, Build, Ship and delivery

Ordered Oct 9 (Friday), order picked following Thursday. Took delivery Dec 24th ???

BFF3B8C1-8697-4308-804F-DA6CE7705C38.jpeg
 
Ordered 11/25/20. Finally got a vin 01/07/21 but tracking site says the order was confirmed 11/27/20. No other updates yet.
 
Ordered 11/25/20. Finally got a vin 01/07/21 but tracking site says the order was confirmed 11/27/20. No other updates yet.
Ordered mine 11/17 received vin 2 weeks after. As of 1/5 scheduled for production, but no date yet.
 
Just ordered mine about an hour ago. Have a 10 priority code if that means anything. Dealer said they are thinking 8-10 weeks. I'm like a kid counting the days until Christmas..
 
Good luck! Don't hold your breath. ;)
 
Ordered 10/19
VIN 12/02
Window Sticker 12/18
Scheduled for production 1/06/21
Built ?
Est delivery 2/5/21
 
Ordered 10/29
VIN 11/9 (might have been earlier but that’s when I asked)
In production/ Window Sticker 12/21
Scheduled for build 1/8 (per salesman)
Delivery ??????????????
 
These dates will be useful tools to help Tremor believers ”lKeep The Faith”. I ordered my Tremor December 14 no additional dates as yet.
I ordered December 18 and was expecting something today. Nothing. Looks like we're generally on the same schedule.
 
I ordered December 18 and was expecting something today. Nothing. Looks like we're generally on the same schedule.
I’m in the club too 15th for me
 
  • Like
Reactions: VB!
Ordered F250 Plat 7.3 11/25; got Vin 12/11; Website switched to "Scheduled for production" 1/4 ; Window sticker 1/5. Nothing else so far. Dealer originally stated build week was 1/11
 
Ordered F250 Plat 7.3 11/25; got Vin 12/11; Website switched to "Scheduled for production" 1/4 ; Window sticker 1/5. Nothing else so far. Dealer originally stated build week was 1/11
I'm a little bit confused. People are listing the day they got their window sticker. Mine was there as soon as I got the vin. Does that just mean my dealer should have been able to give me the vin sooner? Does the window sticker availability mean anything?

Sorry. I didn't mean this to be a reply to you personally, just a post in the thread.
 
Just ordered mine about an hour ago. Have a 10 priority code if that means anything. Dealer said they are thinking 8-10 weeks. I'm like a kid counting the days until Christmas..
Hahah! Unless it’s already built good luck, Ford is having issues right now that’s for sure. Prob more like 14 weeks
 
Ordered 7.3 Lariat on 11/7/20. It changed to "In production" today, 1/8/21. Woohoo! Build week was originally given as 1/11/21. Priority code 10.
 
I ordered mine 11/3 got a vin 2 weeks later and a build date of 1/18 so hoping nothing changes ?
 
I ordered December 18 and was expecting something today. Nothing. Looks like we're generally on the same schedule.
Keep me posted. I’ll watch for the big V
 
Hahah! Unless it’s already built good luck, Ford is having issues right now that’s for sure. Prob more like 14 weeks
The 10 priority code is good so he may see it in 8-10 if they have the allocation.

I heard Ford has suppler issues that are affecting the production. The supply chains have been interrupted everywhere. Most buyers get 19 code
 
I did not call dealer 1 time after truck was ordered.....that speeds things up.?
 

Latest Discussions

Back
Top