6/20/22 build week

Hello everyone!
This is my first post on the forum. Intend to post an introduction once I take delivery…

For now, I had to reply to this gentleman. My timeline is identical to you, except I received my WS a day earlier…
Dealer has not predicted a delivery date.

I’m about a two and a half hour drive from the factory.
See who takes delivery first… 🤔

Batch #006556, 1924/ 3666.
Def curious to see the transit times. I'm in Nashville.
 
Posted this on the production update thread, but just wanted to make sure the 6/20 build week crew has the update...

Another good email this morning! After 7 months minus 1 day, got the built email. Projection on the email is for delivery to CA between 7/18-7/24. Still listed as Convoy for shipping. If this method holds, maybe it will be easier to track than shipping by rail.
Order date: 11/22
VIN: 4/21
Prod sched: 5/23 - 5/30 - 6/13 - 6/20
WS: 6/14
Built email: 6/21
Batch #: 6524
Build #: 1144/2431
Carb Gray Platinum Tremor 250 6.7

This has definitely been a long and frustrating journey, especially with the MCS delete, but still very excited to get closer to having my new truck.
 
Have an insanely long list of modules. Don’t know what it all means, but it’s almost built I think!
 
Scheduled build week 6/20 but went into production 6/16 and window sticker dropped same day. Ordered confirmed 1/14/22 and VIN 5/12/22. Seems like process moved up a few days for me but watching everyday for updates.
 
Def curious to see the transit times. I'm in Nashville.
I know mine was done and built on may 24th. It showed up at the dealership on 6/21. I'm outside of Nashville as well. I know they are having a hard time getting truck drivers to deliver, that seems to be the next problem. Mine kept getting shipping delay emails.
 
A employee at KTP is saying mine will be built today.
Here is my WS
B5AD6C68-F7DD-46B4-992C-DF588810DD6C.jpeg
88735193-62F6-49EE-A63B-DCBE91FAA2E0.jpeg
 
Batch # 06556 build: 2514/3666
Stone gray, 6.7, 5th wheel, lariat value, ultimate trailer tow,
Interior: black
Accessories : wheel well liners, garage door, heated steering, floor mats
Im 2 trucks before you. 2512.
250
Long bed
7.3
BAP
Carbonized Grey
 
Ordered - 11/17/2021
Scheduled - Week of 6/20
006581 393/717

Modules Populated - Evening of 6/21
Built Email - Early AM 6/22
Scheduled Delivery at Illinois Dealer (according to built email) - 7/9-7/15

7.3L Lariat, BAP, tremor, adaptive cruise, Ultimate, Dual Batt/397 Alt, winch, upfitter/garage, flaps, mats, UTT camera
 
Ordered - 11/17/2021
Scheduled - Week of 6/20
006581 393/717

Modules Populated - Evening of 6/21
Built Email - Early AM 6/22
Scheduled Delivery at Illinois Dealer (according to built email) - 7/9-7/15

7.3L Lariat, BAP, tremor, adaptive cruise, Ultimate, Dual Batt/397 Alt, winch, upfitter/garage, flaps, mats, UTT camera
In the same batch as you 597/717. Still no modules or built email. Hopefully will here something today. (y)
 
I know mine was done and built on may 24th. It showed up at the dealership on 6/21. I'm outside of Nashville as well. I know they are having a hard time getting truck drivers to deliver, that seems to be the next problem. Mine kept getting shipping delay emails.
Mine shares the same basic spec as yours. It should come off the truck looking identical!
I‘m just under two hours north of you in KY. Hopefully transport is not such a cluster with this batch!
A employee at KTP is saying mine will be built today.
Here is my WSView attachment 54989View attachment 54990
Is this a personal contact at the plant, or are you on an accessible chat?

In the same batch as you, 1924/ 3666, and my modules populated about an hour ago… 😎
 
Mine shares the same basic spec as yours. It should come off the truck looking identical!
I‘m just under two hours north of you in KY. Hopefully transport is not such a cluster with this batch!

Is this a personal contact at the plant, or are you on an accessible chat?

In the same batch as you, 1924/ 3666, and my modules populated about an hour ago… 😎
Some guy on Facebook just started giving me updates without me asking. Truck is in Trim as of an hour ago.
 
Right? Bonus- he said they've been getting trucks a week before what its scheduled.
Ordered 12/23/21
Build Week 6/20/22
Batch 6628
Tracker just states:

"In Production​

Your order is being manufactured at one of our factories. This can take a few days. When you have a moment, tryout the link to your Window Sticker that is now available lower on the page."

F350 Lariat Tremor 6.7L Diesel, Iconic Silver, Baja, SB, Lariat Ultimate, Garage Door Opener, Aux Switch, Eng. Block Htr, Carpet Delete, Clearance Lights
 
Modules just populated

Batch 6581 597/717

F350 lariat ultimate BAP everything but 5th Wheel and AS.
 
Built! Ordered 11/10/21, let’s see if they can get the truck to granger under 4 weeks

Seems the production pipeline is unfreezing a bit
 
Back
Top