5/2 Build Week

MALANEY

Tremor Fanatic
Joined
Mar 6, 2022
Messages
147
Reaction Points
138
Location
MONROE NC
First Responder
VOL FF/EMT
Who else has a scheduled build week of 5/2

Lariat CCSB Ultimate, Sport, Tremor, 6.7
NO BAP, Bedliner, AS, ACC, 5WP, or MoonRoof
 
Ordered 3/4/22
Scheduled week of 5/2

F250 Lariat CCSB
Ultimate Package
Tremor Package
7.3
Black Appearance Package
Ultimate Trailer Tow Camera System
Dual Alternators
Dual Batteries
Upfitter Switches
Universal Garage Door Opener
Rain Sensing Wipers/Heated steering wheel
Rear Heated Seats
 
Original build week was 3/7 now it’s 5/2
250 platinum tremor 6.7
Removed 5wp, spray in and AS other than that loaded
 
Truck now shows in production. I ordered 3/4/22 and exactly 8 weeks later (today 4/29/22) I just was able to get my window sticker also.
 
Truck now shows in production. I ordered 3/4/22 and exactly 8 weeks later (today 4/29/22) I just was able to get my window sticker also.
Mine was the same. Got the ws a few days later. Still no date for in prod or modules. Showing batch 5712 & 677/1589
 
Mine was the same. Got the ws a few days later. Still no date for in prod or modules. Showing batch 5712 & 677/1589
Mine is batch 5732 and 441/734 so yours is before mine (I think)
 
Still waiting, no modules yet.
 
She’s alive and a Cinco de Mayo truck 🍻🍻. Codes just popped up, batch 5712 is running now.
 
She’s alive and a Cinco de Mayo truck 🍻🍻. Codes just popped up, batch 5712 is running now.
That's great news, can't wait for mine to populate.
 
She’s alive and a Cinco de Mayo truck 🍻🍻. Codes just popped up, batch 5712 is running now.
My Modules just populated today 5/7/22
 
Estimated delivery May 26th - June 1st
 

Attachments

  • A0837249-77CB-4E0D-A078-ED93D9BAFB9D.jpeg
    A0837249-77CB-4E0D-A078-ED93D9BAFB9D.jpeg
    76.6 KB · Views: 29
Still waiting. No built email yet. Sales gonna check vvr when he gets in this morning.
 
Just updated to “Shipped” on the tracker
 

Attachments

  • FD13E539-75D3-4836-874D-CC9A5A5049DD.jpeg
    FD13E539-75D3-4836-874D-CC9A5A5049DD.jpeg
    56.3 KB · Views: 22
I think this wait is worse that waiting on a vin. Still showing in prod since 5/5. Window sticker hasn’t been available all weekend.
 
I think this wait is worse that waiting on a vin. Still showing in prod since 5/5. Window sticker hasn’t been available all weekend.

I can’t believe mine has shipped and yours still isn’t built. Yours is the 6.7 and mine is the 7.3 (mine has more other options then yours) I wonder if they are missing diesel parts???
 
I can’t believe mine has shipped and yours still isn’t built. Yours is the 6.7 and mine is the 7.3 (mine has more other options then yours) I wonder if they are missing diesel parts???
I haven't seen any diesel issues on any of the forums. Only thing I can figure is its sitting there waiting on the console vault or wheel liners. Wouldn't think it'd take over 10 days for that though. Last time I checked with the dealer (last monday) they were showing produced with an ETA of 5/25-5/31 but weren't hopeful with those dates due to driver/truck shortages. No rail info has shown up for them either. Im gonna follow up again tomorrow.
 
Back
Top